IntelliGrid Architecture

 

 

Home

Parent Menu

Overview of Functions
Market Operations
Transmission Operations
Distribution Operations
HV Generation
Distributed Resources
Customer Services
List of IT Use Cases
List of Functions

Same Level Menu

Substation Data Acqu
Automated Control Base
Auto Restoration
Contngcy Analysis Base
Contngcy Analys Future
Emergency Control Base
Inter-Area Oscill Damp
Self-Healing Grid
Synchro Phasor
Systemwide Volt Control
Voltage Security
List of Brief Trans Functions

Child Menu

 

Search IntelliGrid Site

Questions/Comments

Questions

 

Responses

 

 

Transmission Operations - System-wide Automatic Voltage Control Function

Contents

Narrative

Perform wide-area voltage control through closed loop control by measuring the wide area voltages, computing a control solution, and effecting wide area control

System wide voltage and subsequent power flow can be optimized by looking at the voltage profile for a large segment of the power grid, choosing set-points for the voltages at the various control points, and issuing the appropriate control commands to effect the desired operating point. 

Prior to starting the voltage control process, the system would need to determine the availability (in/out of service) and capacity of all the control points around the system.  This information would then have to be factored into the voltage control algorithm.  For example, if part of a series capacitor bank is out of service, the remaining available series impedance shall be reported; if an SVC is out of service, this shall be reported to the Controller.

Voltage (phase and sequence) from 10 to a few hundred points around the power system are to be measured and transmitted to one or more Controllers located around the power system.  Each Controller analyzes the measured voltages and computes an optimal voltage control solution.  The control solution would include linear control of generator voltage and synchronous condenser outputs, transformer tap changer control, voltage regulator control, Thyristor controlled Series Capacitor (TCSC) control, Static Var Capacitor control, DC link power flows, as well as on/off control of series and shunt capacitor banks and reactor switching.  A measure/control link to DER/ADA/Consumer/Industrial devices is also envisioned that would enable some voltage support/load shed (in emergency conditions) from the distribution system.  Upon issuance of the control command, the device receiving the command shall acknowledge that the voltage control command was received and subsequently executed.

This devices in this scenario would also be used for Voltage Security (see Voltage Security use case) and the steps for Voltage Security are called out as an alternate sequence in the function steps.

On failure of the communication system to a particular node, that node shall resort to local voltage control with previously calculated set-points.  Failure of communication to any remote node shall be immediately (within 1 second) to the system operator and other monitoring points as desirable. 

Steps

Normal Sequence Steps

 

#

Event

Name of Process/Activity

Description of
Process/Activity

Information Producer

Information
Receiver

Name of Info Exchanged

IntelliGrid Architecture Environments

1.1

System Initialization

Initialization

System operator starts the automatic voltage control process

Controller

Controllable Device

Initialization data; configuration data

Non Critical DAC

1.2

Programmed data rate

Measure System Voltage

Measure system voltage and stream to Phasor Data Concentrator

Phasor Measurement Unit

Phasor Data Concentrator

Phasor Data stream

Inter-Field Equipment

1.3

Programmed data rate

Aggregation

Aggregate phasor data streams from multiple Phasor Measurement Unit sources

Phasor Data Concentrator

Controller

Aggregated Phasor Data

Non Critical DAC

1.4

Programmed data rate

Decision

Manipulation of phasor data to determine the control required to implement the optimal system voltage

Controller

Controllable Device

Control information

Non Critical DAC

1.5

Programmed data rate

Acknowledge

Acknowledge that the Controllable Device received the control command and were able to execute as requested

Controllable Device

Controller

Status information

Non Critical DAC

 

Steps – Alternative / Exception Sequences

 

#

Event

Name of Process/Activity

Description of
Process/Activity

Information Producer

Information
Receiver

Name of Info Exchanged

IntelliGrid Architecture Environments

2.1

Large system voltage angle detected

Angle Check

Check the difference of the angles of the voltages across the system

Controller

Regional System Operator; Voltage Security Controller

Voltage Security alarm; Voltage angle difference

Non Critical DAC

2.2

Large system voltage angle detected

Voltage Security Control

Determine the corrective action to be taken upon detection of a voltage security issue

Voltage Security Controller

Controller

System phase angles

Non Critical DAC

2.3

Large system voltage angle detected

Issue Control Action

Issue the control actions to the controllable elements around the system

Controller

Controllable Device

Control

Non Critical DAC

2.4

Control action received

Acknowledge

Acknowledgement that the control action has been received and executed

Controllable Device

Controller

Control Acknowledge

Non Critical DAC

 

 