IntelliGrid Architecture

 

 

Home

Parent Menu

Overview of Functions
Market Operations
Transmission Operations
Distribution Operations
HV Generation
Distributed Resources
Customer Services
List of IT Use Cases
List of Functions

Same Level Menu

Substation Data Acqu
Automated Control Base
Auto Restoration
Contngcy Analysis Base
Contngcy Analys Future
Emergency Control Base
Inter-Area Oscill Damp
Self-Healing Grid
Synchro Phasor
Systemwide Volt Control
Voltage Security
List of Brief Trans Functions

Child Menu

 

Search IntelliGrid Site

Questions/Comments

Questions

 

Responses

 

 

Transmission Operations - Brief Use Cases

T-1 Long term transmission planning (1 year to 5 years ahead)

T-1.1 Long term load forecast

T-1.2 Forecast alternatives for generation sources (Probable market conditions)

T-1.3 Plan transmission upgrades and additions (participation in ISO/RTO expansion plan)

T-1.4 Plan automation of transmission system for SCADA , Equipment Monitoring, and EMS

T-1.5 Prepare long-term contracts with Distribution Utilities

T-1.5.1 Transmission voltage management

T-1.5.2 Distribution reactive power support (power factor) in the D-T interface

T-1.5.3 T&D information exchange

T-1.6 Prepare emergency response planning, e.g. Ice Storm, Hurricane, Catastrophic outages

T-1.7 Ensure hard copies of all schematics, diagrams, relay settings are available

T-1.8 Prepare inventory and personnel plans based on neighboring load, tie point capacity, etc

T-2 Medium-term planning (1 month to 1 year)

T-2.1 Forecast annual load

T-2.2 Consider probable generation sources

T-2.3 Equipment and Line Maintenance

T-2.4 Calculate system utilization based on forecast load and nameplate ratings

T-2.5 Schedule maintenance operations - time-based

T-2.6 Schedule maintenance operations - predictive, based on data and models

T-2.7 Schedule equipment replacement - based on age of equipment

T-2.8 Schedule equipment replacement - predictive, based on data and models

T-2.9 Schedule equipment replacement - based on contingency scenarios

T-2.10 Schedule spare distribution, ensure sufficient at each site

T-2.11 Revise contracts with Distribution Utilities

T-3 Operational planning (1 day to 1 month)

T-3.1 Short-term load forecast

T-3.2 Short-term generation alternatives based on annual maintenance plan and market conditions

T-3.3 Planned outage management

T-3.4 Operators determine needed transmission outages

T-3.5 Planners/operators perform load analysis of substation equipment based on data

T-3.6 Operators submit transmission outages and constraints to RTO/ISO

T-3.7 Dynamic equipment capacity - change write-up

T-3.8 Protection engineer, to alter relay settings

T-4 Real-time normal operator actions (Using SCADA/EMS)

T-4.1 SCADA system monitors transmission system

T-4.2 Monitor plant state (open/close)

T-4.3 Monitor system activity and load (current, voltage, frequency, energy)

T-4.4 Monitor equipment condition (overheat, overload, battery level, capacity)

T-4.5 Monitor environmental (fire, smoke, temperature, sump level) and Monitor security (door alarm, intrusion, cyber attack)

T-4.6 Monitor security records (audio/video recording)

T-4.7 Operators handle alarms

T-4.8 Intelligent alarm processing should happen here as well as in (6)

T-4.9 Distribution of alarms to non-operators

T-4.10 overloads and replacement issues to maintenance engineer

T-4.11 automated work management system

T-4.12 fault records and SOEs to protection engineers

T-4.13 info to billing dept. re: possible refunds or reliability contract

T-4.14 external security or emergency response teams

T-4.15 Operators perform supervisory control of switching operations

T-4.16 Manual switching

T-4.17 Transfer of Authority

T-4.18 Automation system controls voltage, var and power flow based on algorithms, real-time data, and network-linked capacitive and reactive components

T-4.19 All items listed under 6h could also be performed under Normal operation as normal load management, I.e. "peak shaving" or temporary overloading of equipment due to other manual operations

T-4.20 Operators changes setup/options of EMS functions

T-4.20.1 Periodicity of real-time sequence/Cold Initiation

T-4.20.2 Event triggers

T-4.20.3 Manual initiations

T-4.20.4 Contingency list

T-4.20.5 Application tuning parameters

T-4.20.6 Other

T-4.21 Operators prepare for storm conditions based on weather data and history and change recloser settings

T-4.22 Operators prepare for storm conditions based on weather data and history and change alarm thresholds

T-4.23 Prepare for transformer clipping (e.g. Solar wind/Solar Magnetic Disturbance raising ground DC offset)

T-5 Network Analysis (real-time)

T-5.1 EMS system performs model update, state estimation, bus load forecast

T-5.2 EMS system performs contingency analysis, recommends preventive and corrective actions

T-5.3 EMS system performs optimal power flow analysis, recommends optimization actions

T-5.4 EMS system or planners perform stability study of network

T-6 Real-time emergency operations (system protection level)

T-6.1 Power System Protection

T-6.2 Emergency Operations performs Under-frequency load/generation shedding

T-6.3 Emergency Operations performs Under-voltage load shedding

T-6.4 Emergency Operations performs Conditional localized load shedding

T-6.5 Recovery from voltage or frequency-based load shedding

T-6.6 LTC control/blocking

T-6.7 Shunt control

T-6.8 Series compensation control

T-6.9 System separation detection

T-6.10 Wide area real time instability recovery

T-6.11 Operators manage emergency alarms

T-6.12 SCADA/EMS aids operators in locating fault

T-6.13 Operators dispatch field crews for restoration

T-6.14 SCADA system performs intelligent alarm processing

T-6.15 Local alarm reduction within substation

T-6.16 Centralized alarm reduction based on events from multiple substations

T-6.17 SCADA system performs disturbance monitoring analysis (including fault location)

T-6.18 SCADA/EMS performs dynamic limit calculations for transformers and breakers based on real time data from equipment monitors

T-6.19 SCADA/EMS performs pre-arming of fast acting emergency automation

T-6.20 SCADA/EMS generates signals for emergency support by Distribution Utilities (according to the T&D contracts)

T-6.21 Emergency voltage and var control for providing dispatchable real and/or reactive loads

T-6.22 Emergency load re-balancing between T/D substations by feeder reconfiguration

T-6.23 Activation of interruptible/curtailable load

T-6.24 Activation of direct load control

T-6.25 Activation of distributed resources

T-6.26 Activation of other load management functions

T-6.27 Operators performs system restorations based on system restoration plans prepared (authorized) by operation management

T-7 Post operations

T-7.1 All systems archive logs and reports

T-8 Power system equipment maintenance (mobile enabled work force)

T-8.1 Substation and Line Maintenance inlcuding operation blocking

T-8.2 Periodic (time-based) maintenance

T-8.3 Based on age of equipment

T-8.4 Based on predictive models driven by real-time data

T-8.5 Maintenance staff maintain transmission lines

T-8.6 Request that operator block reclosing for maintenance purposes

T-8.7 Maintenance staff provides information for updating relevant databases

T-8.8 Maintenance staff refer to substation drawings (online)

T-9 SCADA/EMS Maintenance

T-9.1 SCADA/EMS personnel updates SCADA/EMS databases

T-9.2 SCADA/EMS personnel updates EMS applications

T-9.3 SCADA/EMS personnel updates operator interfaces

T-9.4 SCADA/EMS personnel updates interfaces with other systems

T-9.5 SCADA/EMS personnel performs diagnostics of the SCADA/EMS systems

T-10 Operator and SCADA/EMS personnel training

T-10.1 Operators and SCADA/EMS personnel perform periodic training by using the Operator Training Simulator

T-10.2 Operators and SCADA/EMS personnel participate in advanced education programs

T-11 Engineering

T-11.1 Protection engineers perform protection engineering

T-11.1.1 Duties: base case, fault studies, relay settings, protection coordination, fault analysis

T-11.1.2 Needs data: line/equipment capacity, relay specs, PT/CT ratios, fault records, SOE data, event info (relay 'targets' - which element picked up)

T-11.2 Substation engineers perform substation engineering

T-11.3 Transmission engineers perform transmission line engineering

T-11.4 Engineering staff provides information for updating relevant databases - from site / online

T-12 Construction management

T-12.1 Construction managers manage asset purchasing

T-12.2 Construction managers plan construction projects

T-12.3 Construction managers manage crew assignments

T-12.4 Construction personnel provides information for updating relevant databases - from the site / online

T-12.5 Construction personnel refer to substation drawings (online)

T-13 Black Start


T-1 Long term transmission planning (1 year to 5 years ahead)

The Purpose of Long term transmission planning (1 year to 5 years ahead) function
is described below...

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.5

1.4

1.9

1.7

2.1

1.7


COMMENTS:
The following comments were collected during the team rating review:


Note: All items rate a 3 for configuration; Many legacy systems with, which to interface



T-1.1 Long term load forecast

The Purpose of Long term load forecast function
is to schedule long-term transmission system capital expenditures
directly involving

Substation IEDs

EMS/DMS databases

Load estimates

performing

Automatically collecting load data and trending the information to predict future loadings on the transmission system

with key interfaces between

IEDs and EMS/DMS databases; EMS/DMS Databases and load forecasting tools; forecasting tools and engineering

with communication configuration requirements of

WAN connections to the IEDs and LAN connections between the databases and the load forecasting tools and engineering

with quality of service requirements of

Of accuracy of measurement and long term storage of load information

with security requirements of

Information integrity and confidentiality

with data management requirements of

Long term storage

Infrequent updates

And potential data sharing with other sources

with constraints of

Interface with legacy systems and databases


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

1.0

1.0

2.0

0.8


COMMENTS:
The following comments were collected during the team rating review:


Constraint=2 connections to many legacy systems will be required; uncertainty, as to where this function will be performed in the future



T-1.2 Forecast alternatives for generation sources (Probable market conditions)

The Purpose of Forecast alternatives for generation sources (Probable market conditions) function
is to anticipate long term generation needs and to plan back-up generation as may be needed due to loss of planned sources
directly involving

Substation IEDs

EMS/DMS databases

Load estimates

performing

Automatically collection of load data and trending the information to predict future generation needs and to plan alternative sources

with key interfaces between

Substation IEDs and RTUs

A communication system

And EMS/generation scheduling software

with communication configuration requirements of

WAN connections to the IEDs and LAN connections between the databases and the load forecasting tools and engineering

with quality of service requirements of

Of accuracy of measurement and long term storage of load information

with security requirements of

Information integrity and confidentiality

with data management requirements of

Long term storage

Infrequent updates

And potential data sharing with other sources

with constraints of

Interface with legacy systems and databases


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

1.0

1.0

2.0

0.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-1.1) Long term load forecast above.



T-1.3 Plan transmission upgrades and additions (participation in ISO/RTO expansion plan)

The Purpose of Plan transmission upgrades and additions (participation in ISO/RTO expansion plan) function
is to

Determine

Based on results of long term forecasts

Future transmission system needs


directly involving

Results of the forcast model

System planning engineers

ISO

RTO

performing

Transmission planning for the system

with key interfaces between

System planning results

And Utility

ISO

And RTO planning engineers

with communication configuration requirements of

WAN connections between the results of the planning studies and any and all involved parties

with quality of service requirements of

Data accuracy

with data management requirements of

Periodic updates

with constraints of

Interface with legacy systems and databases


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

1.0

1.0

2.0

0.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-1.1) Long term load forecast above.



T-1.4 Plan automation of transmission system for SCADA , Equipment Monitoring, and EMS

The Purpose of Plan automation of transmission system for SCADA , Equipment Monitoring, and EMS function
is to

Determine

Based on results of long term forecasts

Future transmission system needs


directly involving

Substation IEDs

EMS/DMS databases

Load estimates

Planning engineers

performing

Analysis of requirements

with key interfaces between

Substation IEDs and RTUs

A communication system

And EMS/generation scheduling software

with communication configuration requirements of

WAN connections between the results of the planning studies and any and all involved parties

with quality of service requirements of

Data accuracy

with data management requirements of

Periodic updates

with constraints of

Interface with legacy systems and databases


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

1.0

1.0

2.0

0.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-1.1) Long term load forecast above.



T-1.5 Prepare long-term contracts with Distribution Utilities

The Purpose of Prepare long-term contracts with Distribution Utilities function
is to

Set the operating guidelines for interfacing with distribution companies - especially defining power requirements

Reactive power

And voltage levels


directly involving

The Transmission company and the distribibution companies

performing

Development of long term contracts

with key interfaces between

Transmission companies and distribution companies

with communication configuration requirements of

WAN communications between the parties involved

with quality of service requirements of

Data accuracy

with security requirements of

Information integrity and confidentiality

with data management requirements of

Periodic updates


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

1.0

3.0

1.0

1.0

1.2


COMMENTS:
The following comments were collected during the team rating review:


Security=3 Contract sensitive material - high security



T-1.5.1 Transmission voltage management

The Purpose of Transmission voltage management function
is similar to function (T-1.5) Prepare long-term contracts with Distribution Utilities above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

1.0

3.0

1.0

1.0

1.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-1.5) Prepare long-term contracts with Distribution Utilities above.



T-1.5.2 Distribution reactive power support (power factor) in the D-T interface

The Purpose of Distribution reactive power support (power factor) in the D-T interface function
is similar to function (T-1.5) Prepare long-term contracts with Distribution Utilities above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

1.0

3.0

1.0

1.0

1.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-1.5) Prepare long-term contracts with Distribution Utilities above.



T-1.5.3 T&D information exchange

The Purpose of T&D information exchange function
is similar to function (T-1.5) Prepare long-term contracts with Distribution Utilities above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

1.0

3.0

1.0

1.0

1.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-1.5) Prepare long-term contracts with Distribution Utilities above.



T-1.6 Prepare emergency response planning, e.g. Ice Storm, Hurricane, Catastrophic outages

The Purpose of Prepare emergency response planning, e.g. Ice Storm, Hurricane, Catastrophic outages function
is to be prepared in case of catastrophic external events
directly involving

System planners

Neigboring utilities

Governmental organizations

Operators

Field crews

performing

Update emergency response plan

with key interfaces between

Planners

Internal and external organizations

with communication configuration requirements of

Much face-to-face communication required

with quality of service requirements of

Must be available across the organization

At many redundant sites

with security requirements of

Confidentiality

with data management requirements of

Crossing organizational boundaries

with constraints of

Legacy paper-based systems; awareness of the plan must be periodically refreshed


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

2.0

2.0

2.0

1.2


COMMENTS:
The following comments were collected during the team rating review:


DataMgmt=2 large amount of data - some of, which may not exist in electronic format; it may take 3-4 years for "as built" drawings to find their way into the main engineering drawings

Constraints=2 no process exists today for this process

Security=2 drawings are sensitive documents



T-1.7 Ensure hard copies of all schematics, diagrams, relay settings are available

The Purpose of Ensure hard copies of all schematics, diagrams, relay settings are available function
is to

Permit local access to data vital to recovery

If online access is lost


directly involving

System planners

Operators

Field crews

performing

Distribute up-to-date drawings and settings to each site

with key interfaces between

Planners and remote sites

with communication configuration requirements of

Limited access to many sites

with quality of service requirements of

Data accuracy

Large number of sites

with security requirements of

Data integrity

Authentication

with data management requirements of

Frequent updates; crossing organizational boundaries; large files; long-term storage

with constraints of

Legacy paper-based system for distribution; low bandwidth to many sites; no storage location available at many sites


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

2.0

2.0

2.0

1.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-1.6) Prepare emergency response planning, e.g. Ice Storm, Hurricane, Catastrophic outages above.



T-1.8 Prepare inventory and personnel plans based on neighboring load, tie point capacity, etc

The Purpose of Prepare inventory and personnel plans based on neighboring load, tie point capacity, etc function
is to ensure all parts of the organization are aware of contingency plans for catastrophic events
directly involving

System planners

Neigboring utilities

Governmental organizations

Operators

Field crews

performing

Update inventory

Shipment schedules

Emergency procedures

Personnel role definitions

with key interfaces between

Planners

Internal organization

External organizations

with communication configuration requirements of

Can use business IT environment

with quality of service requirements of

Large volumes (must be communicated to all members of the organization)

with security requirements of

Confidentiality

Non-repudiation

with data management requirements of

Crossing organizational boundaries

with constraints of

Legacy paper-based systems; awareness of the plan must be periodically refreshed


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

3.0

2.0

1.0

1.2


COMMENTS:
The following comments were collected during the team rating review:


Security=3 dependent external organization for information exchange

Constraint=1 legacy process already in place



T-2 Medium-term planning (1 month to 1 year)

The Purpose of Medium-term planning (1 month to 1 year) function
is described below...
with key interfaces between

Data collection IEDs and the load forcasting SW

with communication configuration requirements of

Automatic detection and configuration of load measuring devices

with quality of service requirements of

Relatively reliable and infrequent updates


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

1.0

1.0

1.0

2.0

1.0


COMMENTS:
The following comments were collected during the team rating review:


Constraints=2 location of implementation may change; line of demarcation is not defined yet



T-2.1 Forecast annual load

The Purpose of Forecast annual load function
is to gather short term historical load information to form the basis of estimating loading for the coming year
directly involving

Historical data and load forecasting supplement by market data (load bid data provided by load serving entities)

performing

Data collection

Load forcast processing and automatic allocation of required generation resources

with key interfaces between

Database information and the load forecasting SW

with communication configuration requirements of

LAN connection

with quality of service requirements of

Data accuracy

with security requirements of

Data integrity and confidentiality

with data management requirements of

Long term storage

with constraints of

Interface with legacy systems and databases


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

1.0

1.0

1.0

2.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-2) Medium-term planning (1 month to 1 year) above.



T-2.2 Consider probable generation sources

The Purpose of Consider probable generation sources function
is to gather short term historical load information to form the basis of estimating loading for the coming year
directly involving

Historical data and load forecasting supplement by market data (load bid data provided by load serving entities)

performing

Data collection

Load forcast processing and automatic allocation of required generation resources

with key interfaces between

Database information and the load forecasting SW

with communication configuration requirements of

LAN connection

with quality of service requirements of

Data accuracy

with security requirements of

Data integrity and confidentiality

with data management requirements of

Long term storage

with constraints of

Interface with legacy systems and databases


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

1.0

1.0

1.0

2.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-2) Medium-term planning (1 month to 1 year) above.



T-2.3 Equipment and Line Maintenance

The Purpose of Equipment and Line Maintenance function
is to

Schedule maintenance either on a periodic basis or

Through equipment monitoring

On a Just in Time basis


directly involving

Maintenance schedules

Equipment monitoring equipment

And maintenance crews

performing

Periodic or optimized automatic maintenance scheduling

with key interfaces between

Maintenance database

Power equipment

Diagnostic monitoring equipment

And scheduling software

with communication configuration requirements of

Auto detection and configuration and exception based status communication

with quality of service requirements of

Relatively reliable and infrequent updates

with security requirements of

Data integrity and confidentiality

with data management requirements of

Interface with the asset management database

with constraints of

Interface with legacy systems and databases


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

1.0

2.0

1.0

1.0

1.2


COMMENTS:
The following comments were collected during the team rating review:


Security=2 Access to types and location of spares is sensitive information



T-2.4 Calculate system utilization based on forecast load and nameplate ratings

The Purpose of Calculate system utilization based on forecast load and nameplate ratings function
is to provide estimate of the remaining capacity in the system in order to determine where new capacity is needed; prevent overloading and failures; report capacity to regulatory bodies
directly involving

Equipment engineer

Market analysts

Business leaders

Equipment vendors (through specifications)

SCADA/EMS system

Remote devices

Field equipment

performing

Calculate and report utilization; identify weak or overloaded areas requiring attention

with key interfaces between

Equipment engineers and market forecasters; field equipment and forecasting software

with security requirements of

Data integrity

Confidentiality

with data management requirements of

Crossing organizational boundaries

with constraints of

New process in many organizations


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

1.0

1.0

1.0

2.0

1.2


COMMENTS:
The following comments were collected during the team rating review:


Constraint=2 New process for many organizations



T-2.5 Schedule maintenance operations - time-based

The Purpose of Schedule maintenance operations - time-based function
is to prevent failure of equipment while online; meet warranty requirements
directly involving

Equipment engineer

Equipment vendor (usually through specifications)

performing

Update maintenance schedule

with constraints of

Legacy paper-based systems


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

0.0

0.0

0.0

0.0


COMMENTS:


T-2.6 Schedule maintenance operations - predictive, based on data and models

The Purpose of Schedule maintenance operations - predictive, based on data and models function
is to predict and prevent failure of equipment while online; optimize usage of equipment
directly involving

Equipment engineer

Operator

SCADA/EMS system

Remote devices

Field equipment

performing

Update maintenance schedule

with key interfaces between

Field devices and predictive maintenance software

with communication configuration requirements of

Most sites slow serial access only

with quality of service requirements of

Frequency low but could be large volumes of data once deployment becomes common

with security requirements of

Data integrity; authentication

with data management requirements of

Large databases; long-term storage

with constraints of

Often no communications system or process in place; sensors in place have low communications capabilities


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

0.0

1.0

2.0

3.0

1.4


COMMENTS:
The following comments were collected during the team rating review:


Data Mgmt=2 large amounts of data

Constraint=3 Predictive maintenance is at an early stage from many points of view: utility awareness

Process and infrastructure deployment

Communications capability of devices



T-2.7 Schedule equipment replacement - based on age of equipment

The Purpose of Schedule equipment replacement - based on age of equipment function
is to prevent failure of equipment while online
directly involving

Equipment engineer

performing

Update replacement schedule

with constraints of

Legacy paper-based systems


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

0.0

0.0

0.0

0.0


COMMENTS:


T-2.8 Schedule equipment replacement - predictive, based on data and models

The Purpose of Schedule equipment replacement - predictive, based on data and models function
is to predict and prevent failure of equipment while online; optimize usage of equipment
directly involving

Equipment engineer

Operator

SCADA/EMS system

Remote devices

Field equipment

performing

Update replacement schedule

with key interfaces between

Field devices and predictive maintenance software

with communication configuration requirements of

Most sites slow serial access only

with quality of service requirements of

Frequency low but could be large volumes of data once deployment becomes common

with security requirements of

Data integrity; authentication

with data management requirements of

Large databases; long-term storage

with constraints of

Often no communications system or process in place; sensors in place have low communications capabilities


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

0.0

1.0

2.0

3.0

1.4


COMMENTS:
The following comments were collected during the team rating review:


Data Mgmt=2 diverse data sources

Larger data bases

Long term storage

Constraints=3 Predictive maintenance is at an early stage from many points of view: utility awareness

Process and infrastructure deployment

Communications capability of devices



T-2.9 Schedule equipment replacement - based on contingency scenarios

The Purpose of Schedule equipment replacement - based on contingency scenarios function
is to prevent failure of equipment while online; prevent cascading failures by applying worst-case scenarios to the entire system
directly involving

Equipment engineer; emergency planner

performing

Update replacement schedule

with constraints of

Legacy paper-based systems


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

0.0

0.0

0.0

0.0


COMMENTS:


T-2.10 Schedule spare distribution, ensure sufficient at each site

The Purpose of Schedule spare distribution, ensure sufficient at each site function
is to ensure quick recovery from unexpected failures
directly involving

Equipment engineer

Equipment vendors

Field crews

performing

Update inventory

Shipment schedules

with data management requirements of

Large databases; timely access; crossing organizational boundaries

with constraints of

Legacy paper-based systems


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

0.0

2.0

2.0

0.8


COMMENTS:
The following comments were collected during the team rating review:


Data Mgmt=2 archiving lots of data

Constraints=2 Automating this process presents challenges - mostly paper based today



T-2.11 Revise contracts with Distribution Utilities

The Purpose of Revise contracts with Distribution Utilities function
is to adjust contract goals based upon feedbace from performance to date
directly involving

Transmission companies

Distribution companies

Historical information

Market conditions

performing

Contract evaluation and revision

with key interfaces between

Contracted parties

with communication configuration requirements of

WAN communications between the parties involved

with quality of service requirements of

Data accuracy

with security requirements of

Information integrity and confidentiality

with data management requirements of

Periodic updates

with constraints of

Interface with legacy systems and databases


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

1.0

2.0

1.0

1.0

1.2


COMMENTS:
The following comments were collected during the team rating review:


Security=2 contracts are sensitive material



T-3 Operational planning (1 day to 1 month)

The Purpose of Operational planning (1 day to 1 month) function
is described below...

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

0.0

2.0

2.0

2.0

1.4


COMMENTS:
The following comments were collected during the team rating review:


Security=2 many people working with sensitive load data and back and forth data transmission

DB Mgmt=2 working with lots of historical data

Constraints=2 interfacing with multiple legacy databases from multiple utilities


The rating for Constraints does not match the comment (=1). -- Peter Sanza - 05 Apr 2003


T-3.1 Short-term load forecast

The Purpose of Short-term load forecast function
is to

provide operations personnel and market participants with the expected load from 1 day to a month in

The load forecast is used by operations personnel in predicting network conditions and in determining generation needs for meeting load and

The load forecast is used by market participants in determining or predicting bid prices and demand for the current time and future


directly involving

Historical data and load forecasting supplement by market data (load bid data provided by load serving entities)

performing

Accurate load forecast

with key interfaces between

The Market Agents Information System to retrieve load bids from load serving entities

And to the EMS system for use by Network applications

And operational planning tools

with security requirements of

Required permission, that imposed by the market interface

with data management requirements of

Historically archived for reproducibility for billing &accounting

Billing dispute - post the official load forecast to the market information system for use by market participants


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

0.0

2.0

2.0

2.0

1.4


COMMENTS:
This function has similar interfaces (and ratings) to function (T-3) Operational planning (1 day to 1 month) above.



T-3.2 Short-term generation alternatives based on annual maintenance plan and market conditions

The Purpose of Short-term generation alternatives based on annual maintenance plan and market conditions function
is to

Operational planning tools provide operations personnel and market participants with information used in determining the best economics for planning maintenance down-

These tools are also used by some market operators to determine who has been selected to participate in the market for each time slice in the operational planning study as well as predicting how they will

For power brokers, a prediction on how much energy will be purchased from them for a particular hour when they have been selected to participate for that hour


directly involving

Market participants to replace no shows in the market (energy

Reserve

Regulation

Voltage support

And possible black start )

performing

Generation supply to meet the needs of market

with key interfaces between

The real-time SCADA database for actual market conditions

And the look ahead schedules for the list of market participants, as well, as other market bids used in determining replacement energy for those participants, that don't meet their awarded commitments

with security requirements of

Security encryption and password protection

with data management requirements of

Historically archived for reproducibility for billing &accounting

Billing dispute - post the official accepted generation bids to the market information system for use by market participants


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

0.0

2.0

2.0

2.0

1.4


COMMENTS:
This function has similar interfaces (and ratings) to function (T-3) Operational planning (1 day to 1 month) above.



T-3.3 Planned outage management

The Purpose of Planned outage management function
is to

Operational planning tools provide operations personnel and market participants with information used in determining the best economics for planning maintenance down-

These tools are also used by some market operators to determine who has been selected to participate in the market for each time slice in the operational planning study as well as predicting how they will

For power brokers, a prediction on how much energy will be purchased from them for a particular hour when they have been selected to participate for that hour


directly involving

Transmission owners and market participants

performing

Market evaluation - determine the chosen market participants based on evaluated price, which is impacted by the topology of the network, as determined by outage management

with key interfaces between

The look-ahead LMP prices and load forecasts used to determine the economics regarding planned outages

with security requirements of

Security encryption and password protection for the input of the data - electrical security of the network would then be determine by the ISO (no voltage or power flow violation)

with data management requirements of

Historically archived outage data

Market participants for risk and bid strategy analysis


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

0.0

2.0

2.0

2.0

1.4


COMMENTS:
This function has similar interfaces (and ratings) to function (T-3) Operational planning (1 day to 1 month) above.



T-3.4 Operators determine needed transmission outages

The Purpose of Operators determine needed transmission outages function
is to

Operational planning tools provide operations personnel and market participants with information regarding the impacts of unplanned transmission outages via short-term planning

Impacts may include changes in energy demand, energy market price, or changes in congestion costs


directly involving

Operators

SCADA real time database

Field RTUs

performing

Real time outage (un-planned)

with key interfaces between

the online EMS system for evaluating and controlling transmission outages as they

Additionally, operations personnel have access to planned outage information obtained from the Market Agents Information System

with security requirements of

Electrical security of the network would then be determined by the ISO (no voltage or power flow violation)

with data management requirements of

Historically archived to reproduce actual condition for billing accounting and billing dispute - post official results for market participants


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

0.0

2.0

2.0

2.0

1.4


COMMENTS:
This function has similar interfaces (and ratings) to function (T-3) Operational planning (1 day to 1 month) above.



T-3.5 Planners/operators perform load analysis of substation equipment based on data

The Purpose of Planners/operators perform load analysis of substation equipment based on data function
is to determine which substation equipment can be temporarily overloaded in order to facilitate the planned outage
directly involving

Operator

SCADA/EMS tools

Substation devices

Substation equipment

performing

Retrieve current load; compare to nameplate specs; determine utilization; determine maintenance state of devices based on condition monitoring data; display alternate choices

with key interfaces between

EMS/SCADA and substation devices; possibly EMS and SCADA if they are separate

with communication configuration requirements of

Gather data from multiple substations

with quality of service requirements of

Within seconds

But not necessarily 1 second

with security requirements of

Integrity

Authentication

with data management requirements of

None

with constraints of

Existing sensors are compute-constrained; existing software may not be prepared to take condition monitoring data, as input


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

0.0

0.0

1.0

3.0

1.0


COMMENTS:
The following comments were collected during the team rating review:


Data Mgmt=1 much new data being brought in

Constraint=3 Integrating condition monitoring into a planned outage is a new process in most organizations



T-3.6 Operators submit transmission outages and constraints to RTO/ISO

The Purpose of Operators submit transmission outages and constraints to RTO/ISO function
is to Operational planning tools such as an Equipment Outage Scheduler or a Transmission Switching Application Scheduler provide operations personnel and the market participants detailed information needed to predict network topology in advance
directly involving

Transmission owners and market participants

performing

Market evaluation - determined the chosen market participants based on evaluated price, which is impacted by the topology of the network, as determined by outage management

with key interfaces between

The RTO/ISO to provide real-time and look-ahead transmission outage information, as well, as real-time and look-ahead device limit information

with security requirements of

Security encryption and password protection for the input of the data - electrical security of the network would then be determined by the ISO (no voltage or power flow violation)

with data management requirements of

Historically archived outage data

Market participants for risk and bid strategy analysis


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

0.0

2.0

2.0

2.0

1.4


COMMENTS:
This function has similar interfaces (and ratings) to function (T-3) Operational planning (1 day to 1 month) above.



T-3.7 Dynamic equipment capacity - change write-up

The Purpose of Dynamic equipment capacity - change write-up function
is to acquire nameplate specifications on substation equipment to determine overload capacity
directly involving

Operator

Equipment engineer

performing

Retrieve nameplate data for concerned devices

with key interfaces between

EMS/SCADA and maintenance database

with communication configuration requirements of

N/a

with quality of service requirements of

Within seconds

Possibly minutes

with security requirements of

Integrity

Authentication

with data management requirements of

Large databases of recent condition monitoring analysis; may cross organizational boundaries

with constraints of

New process in many organizations


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

2.0

0.0

2.0

3.0

1.6


COMMENTS:
The following comments were collected during the team rating review:


QoS=2 high availability

Data Mgmt=2 long time (50 years) history data

Constraints=3 new applications; new models



T-3.8 Protection engineer, to alter relay settings

The Purpose of Protection engineer, to alter relay settings function
is to alter protection settings to compensate for planned outage
directly involving

Operator

Protection engineer

performing

Determine whether protection settings need to be changed; update settings if necessary

with key interfaces between

EMS/SCADA and protection modelling software or protection engineer

with communication configuration requirements of

N/a

with quality of service requirements of

Within seconds

Possibly minutes

with security requirements of

Integrity

Authentication

with data management requirements of

Large databases of settings; may cross organizational boundaries

with constraints of

Existing process is manual or verbal?


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

3.0

2.0

3.0

1.6


COMMENTS:
The following comments were collected during the team rating review:


Security=3 settings should only be issued by an authorized protection engineer

Data Mgmt=2 interface with remote relay database

Constraints=3 Process may not be automated; organization boundaries presently prevent implementation (most managers want someone on site to verify settings); infrastructure does not presently exist



T-4 Real-time normal operator actions (Using SCADA/EMS)

The Purpose of Real-time normal operator actions (Using SCADA/EMS) function
is to see details below

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
The following comments were collected during the team rating review:


Config=2 transition from serial to LAN/WAN & variety of media; heterogenious environment

Qos=2 high availability; high accuracy

Security=2 Securing this data over legacy media-and-compute constrained systems may be challenging and controls

Data Mgmt=2 archiving and forensics

Constraints=2 interface with legacy systems


The following comments were collected during the peer review:


Note: these ratings apply on a-z unless specifically noted



T-4.1 SCADA system monitors transmission system

The Purpose of SCADA system monitors transmission system function
is to

Provide operations personnel with state estimation to validate the quality of the SCADA

Maintains bus load forecast via adaptive update from state estimator solution


directly involving

SCADA

Schedule information

performing

Validate the quality of SCADA telemetry and generate a base case for further network analysis

with key interfaces between

The online EMS system, which contains network applications, that provide state estimation and automatically updates/maintains the historical bus load forecasts

with security requirements of

Telemetry data and scheduled information (load forecast

Accepted generation bids

Outage management schedules)

with data management requirements of

Historical archived state estimate solution - share estimated value with the ISO/RTO


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

1.0

2.0

2.0

1.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.



T-4.2 Monitor plant state (open/close)

The Purpose of Monitor plant state (open/close) function
is to Inform operator of current picture of all switch and breaker positions so the operator can take action when failures occur
directly involving

Operator

SCADA/EMS system

Remote IEDs

performing

Display open or closed position

with key interfaces between

SCADA to EMS; SCADA to IEDs

with communication configuration requirements of

Any or none of those listed

with quality of service requirements of

Typically within 1 second; must not lose any changes of state; data timestamped within 1 ms; high volumes due to number of devices monitored

with security requirements of

Information integrity and authenticitiy

with data management requirements of

Frequent updates to historical Sequence of Events log

Distribution of this data is becoming much more widespread

Crossing organizational boundaries

with constraints of

Large number of legacy systems; often compute-constrained or media-constrained


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

1.0

2.0

2.0

1.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4.1) SCADA system monitors transmission system above.



T-4.3 Monitor system activity and load (current, voltage, frequency, energy)

The Purpose of Monitor system activity and load (current, voltage, frequency, energy) function
is to Inform operator of curent load on any given component of the power system so the operator can re-route traffic intelligently when necessary
directly involving

Operator

SCADA/EMS system

Remote IEDs

performing

Display current load

with key interfaces between

SCADA to EMS; SCADA to IEDs

with communication configuration requirements of

Any or none of those listed

with quality of service requirements of

Typically within 5 seconds; high volumes due to number of devices monitored

with security requirements of

Information integrity and authenticitiy

with data management requirements of

Frequent updates although only recent data is usually of importance

More demand for historical energy data recently

Beginning to cross organizational boundaries

with constraints of

Large number of legacy systems; often compute-constrained or media-constrained


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

1.0

1.0

2.0

2.0

1.6


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4.1) SCADA system monitors transmission system above.



T-4.4 Monitor equipment condition (overheat, overload, battery level, capacity)

The Purpose of Monitor equipment condition (overheat, overload, battery level, capacity) function
is to Inform operator of current or imminent equipment failures so the operator can re-route power around the failed equipment
directly involving

Operator

SCADA/EMS system

Remote IEDs

performing

Display alarm condition

with key interfaces between

SCADA to EMS; SCADA to IEDs

with communication configuration requirements of

Any or none of those listed

with quality of service requirements of

Within 1 second or sooner; large numbers of devices

with security requirements of

Information integrity and authenticitiy

with data management requirements of

Historical record required

with constraints of

Large number of legacy systems; often compute-constrained or media-constrained


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

1.0

1.0

2.0

2.0

1.6


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4.3) Monitor system activity and load (current, voltage, frequency, energy) above.



T-4.5 Monitor environmental (fire, smoke, temperature, sump level) and Monitor security (door alarm, intrusion, cyber attack)

The Purpose of Monitor environmental (fire, smoke, temperature, sump level) and Monitor security (door alarm, intrusion, cyber attack) function
is to Inform operator of emergencies so the operator can dispatch help
directly involving

Operator

SCADA/EMS system

Remote IEDs

Field crews

Emergency response teams

performing

Display alarm condition

with key interfaces between

Handling may lead to dispatch of field crews or calling emergency response teams

with communication configuration requirements of

Any or none of those listed

with quality of service requirements of

Within 1 second or sooner; large numbers of devices

with security requirements of

Information integrity and authenticitiy

with data management requirements of

Historical record required

with constraints of

Large number of legacy systems; often compute-constrained or media-constrained


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

1.0

1.0

2.0

2.0

1.6


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4.3) Monitor system activity and load (current, voltage, frequency, energy) above.



T-4.6 Monitor security records (audio/video recording)

The Purpose of Monitor security records (audio/video recording) function
is to

Allow operators or external security agencies to determine, which human being has accessed a given site

And what they are doing


directly involving

Operator

Remote camera/microphone

External security agency

performing

Play audio/video recording of site

with key interfaces between

Must be in a format, that could be provided to police or other external agency

with communication configuration requirements of

Video is a data format not widely distributed yet

with quality of service requirements of

High data volumes

Infrequently

with security requirements of

Confidentiality

Authenticity

And data integrity

with data management requirements of

Large databases

with constraints of

Processes not in place; must be in format suitable for submission to law enforcement


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

3.0

3.0

2.0

2.0

0.0

2.0


COMMENTS:
The following comments were collected during the team rating review:


Configuration=3 more complexity in routingVideo data

Is not widely distributed yet

But will become more important

QoS=3 high bandwidth required

Data Mgmt=2 potential archiving of video



T-4.7 Operators handle alarms

The Purpose of Operators handle alarms function
is to Contingency Analysis and post-contingency analysis remedial action provides the ability to correct problems caused by harmful contingencies caused by outages or changes in generation
directly involving

Result from contingency analysis is analyised by post contingency optimal power flow

performing

Optimization to mitigate harmful contingency

with key interfaces between

the online EMS system which contains network applications that provides real-time and study contingency analysis used in determining harmful

The network applications may then interface to available network optimization applications to determine corrective actions to either remedy harmful contingencies or prevent the harmful contingencies from occurring

with security requirements of

Electrical limit within the network (voltage limit

Line flow limits…)

with data management requirements of

Historical archived recommended and actual controls-control center's operator use recommended control to optimize the network


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.



T-4.8 Intelligent alarm processing should happen here as well as in (6)

The Purpose of Intelligent alarm processing should happen here as well as in (6) function
is to See 6
directly involving

See 6

performing

See 6

with key interfaces between

See 6

with communication configuration requirements of

See 6

with quality of service requirements of

See 6

with security requirements of

See 6

with data management requirements of

See 6

with constraints of

See 6


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.



T-4.9 Distribution of alarms to non-operators

The Purpose of Distribution of alarms to non-operators function
is to missing purpose

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

3.0

2.0

2.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.


The following comments were collected during the team rating review:


Security=3 authentication for off-site alarm delivery


This function is missing the description. -- Peter Sanza - 05 Apr 2003


T-4.10 overloads and replacement issues to maintenance engineer

The Purpose of overloads and replacement issues to maintenance engineer function
is to Ensure equipment is replaced either before it fails or when it fails
directly involving

Operator

Maintenance Engineer

performing

Identify equpment and event

with key interfaces between

SCADA/EMS and maintenance database

with communication configuration requirements of

N/a

with quality of service requirements of

Before work-around solutions are insufficient to compensate for failed equipment

with security requirements of

Authentication

Non-repudiation

with data management requirements of

Updating a large database

with constraints of

Currently a manual process


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

0.0

2.0

2.0

3.0

1.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.


The following comments were collected during the team rating review:


Constraints=3 automating manual process



T-4.11 automated work management system

The Purpose of automated work management system function
is to Dispatch field crews in an efficient manner with proper records
directly involving

Operator

Work Management System

Field crews

performing

Identify the task to perform

The location

And time and date the change must take place

with key interfaces between

SCADA/EMS and work management system

with communication configuration requirements of

N/a

with security requirements of

Authentication

Non-repudiation

with constraints of

Currently a manual process

If done at all


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

0.0

2.0

0.0

3.0

1.4


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4.10) overloads and replacement issues to maintenance engineer above.


The following comments were collected during the team rating review:


Constraints=3 automating manual process



T-4.12 fault records and SOEs to protection engineers

The Purpose of fault records and SOEs to protection engineers function
is to Provide protection engineers with information to analyze root cause of a fault and the performance of the power system in responding to it
directly involving

Operator

IEDs

Protection Engineer

performing

Identify the type of fault

The equipment involved

Supply the SOEs around the time of the fault and waveform captures at the time of the fault

with key interfaces between

SCADA/EMS and protection database

with communication configuration requirements of

N/a

with quality of service requirements of

Before returning substation to normal operating state? Before installing new protection equipment? Large waveform capture files

with security requirements of

Authentication

with data management requirements of

Large volumes of data

with constraints of

Currently a manual process


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

0.0

2.0

2.0

3.0

1.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4.10) overloads and replacement issues to maintenance engineer above.


The following comments were collected during the team rating review:


Constraints=3 automating manual process; interfacing w/ legacy devices



T-4.13 info to billing dept. re: possible refunds or reliability contract

The Purpose of info to billing dept. re: possible refunds or reliability contract function
is to Inform billing department when a failure occurs that could impact revenue
directly involving

Operator

Billing department

Legal department

performing

Contact legal or billing to determine guidelines for event

Compare conditions of event to established guidelines

Update databases with particulars of event if it fits the guidelines

with key interfaces between

SCADA/EMS and billing/legal

with communication configuration requirements of

N/a

with quality of service requirements of

Before deadline for next billing period

Or, as required by contract

with security requirements of

Authentication

Confidentiality

Non-repudiation

with constraints of

Currently a manual process


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

3.0

1.0

3.0

1.4


COMMENTS:
The following comments were collected during the team rating review:


Security=3 this is the refund cash register - contract admin involved

Constraints=3 not clearly defined process



T-4.14 external security or emergency response teams

The Purpose of external security or emergency response teams function
is to

Bring police

Security

Fire

EMS

Or other external response teams to the utility site to resolve emergency situations


directly involving

Operator

IEDs

Emergency teams

performing

Identify type of event and location

Inform site of the arrival of team

with key interfaces between

Voice or location data to integrated 911 system?

with communication configuration requirements of

N/a

with quality of service requirements of

Immediate

with security requirements of

Authentication

Confidentiality

Non-repudiation

with constraints of

Currently a manual process


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

2.0

1.0

0.0

1.0

1.0


COMMENTS:
The following comments were collected during the team rating review:


QoS=2 urgency of message



T-4.15 Operators perform supervisory control of switching operations

The Purpose of Operators perform supervisory control of switching operations function
is to

Manually open / close breakers

Disconnects

And load breaks in order to effect a desired system state


directly involving

Previously generated switching sequence actions (list)

Field personnel

SCADA RTUs

Manually operated switches

performing

The required actions to achieve the desired end system state

with key interfaces between

The system control center

Substation personnel

And field personnel -, as required

with quality of service requirements of

Good phone communications

with data management requirements of

Manually documenting the resulting system state on the system pin board


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

3.0

3.0

2.0

2.0

2.4


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.


The following comments were collected during the team rating review:


QoS=3 control is a critical function

Security=4 avoid undesired control



T-4.16 Manual switching

The Purpose of Manual switching function
is to

Fault Level Analysis predicts the fault behavior of known, predicted or detected harmful fault cases for operations

Contingency Analysis reports the impacts of relay protection to the network to operations personnel


directly involving

Real-time database

Voltage control SW

Field devices

performing

Fault level analysis- detects harmful fault conditions

with key interfaces between

the online EMS system which contains network applications that provides real-time and study fault level analysis used in determining harmful

Operations personnel then determine whether corrective action should be taken to prevent the conditions where the fault would be harmful

with security requirements of

Fault current limits on all devices

with data management requirements of

Alarm harmful fault condition in real time


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

0.0

0.0

0.0

0.0


COMMENTS:
The following comments were collected during the team rating review:


Human / system interface



T-4.17 Transfer of Authority

The Purpose of Transfer of Authority function
is to missing purpose

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

3.0

3.0

3.0

2.6


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.


The following comments were collected during the team rating review:


QoS=2 high availability of function

Security=3 concept of "transfer of authority" during programmed or emergency situations makes authentication critical Data Mgmt=3 data synchronization across multiple systems Constraints=2 automating manual process; legacy interface; implementation issues as to how function is implemented (transfer between masters

message from master to remotes)



T-4.18 Automation system controls voltage, var and power flow based on algorithms, real-time data, and network-linked capacitive and reactive components

The Purpose of Automation system controls voltage, var and power flow based on algorithms, real-time data, and network-linked capacitive and reactive components function
is to

Automatically adjust voltage

Vars

And power flow to optimize network efficiency


directly involving

SCADA/EMS and substation IEDs

performing

Adjust tap changers; add/remove capacitive and reactive components

with key interfaces between

SCADA/EMS and substation IEDs

with communication configuration requirements of

WAN/LAN

Remote sites

with quality of service requirements of

Fast response (seconds)

with security requirements of

Authentication

Integrity

Non-repudiation

with data management requirements of

Historical record required

with constraints of

Legacy systems in place; or may not be automated at all


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

3.0

3.0

2.0

2.0

2.4


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.


The following comments were collected during the team rating review:


Security=3 control


Why is the rating for QOS rated 2? -- Peter Sanza - 05 Apr 2003


T-4.19 All items listed under 6h could also be performed under Normal operation as normal load management, I.e. "peak shaving" or temporary overloading of equipment due to other manual operations

The Purpose of All items listed under 6h could also be performed under Normal operation as normal load management, I.e. "peak shaving" or temporary overloading of equipment due to other manual operations function
is to See 6c
directly involving

See 6c

performing

See 6c

with key interfaces between

See 6c

with communication configuration requirements of

See 6c

with quality of service requirements of

See 6c

with security requirements of

See 6c

with data management requirements of

See 6c

with constraints of

See 6c


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

3.0

3.0

2.0

2.0

2.4


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4.15) Operators perform supervisory control of switching operations above.



T-4.20 Operators changes setup/options of EMS functions

The Purpose of Operators changes setup/options of EMS functions function
is to see details below

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

2.0

1.0

1.0

1.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.



T-4.20.1 Periodicity of real-time sequence/Cold Initiation

The Purpose of Periodicity of real-time sequence/Cold Initiation function
is similar to function (T-4.20) Operators changes setup/options of EMS functions above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

2.0

1.0

1.0

1.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4.21) Operators prepare for storm conditions based on weather data and history and change recloser settings above.



T-4.20.2 Event triggers

The Purpose of Event triggers function
is similar to function (T-4.20) Operators changes setup/options of EMS functions above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

2.0

1.0

1.0

1.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4.21) Operators prepare for storm conditions based on weather data and history and change recloser settings above.



T-4.20.3 Manual initiations

The Purpose of Manual initiations function
is similar to function (T-4.20) Operators changes setup/options of EMS functions above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

2.0

1.0

1.0

1.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4.21) Operators prepare for storm conditions based on weather data and history and change recloser settings above.



T-4.20.4 Contingency list

The Purpose of Contingency list function
is similar to function (T-4.20) Operators changes setup/options of EMS functions above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

2.0

1.0

1.0

1.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4.21) Operators prepare for storm conditions based on weather data and history and change recloser settings above.



T-4.20.5 Application tuning parameters

The Purpose of Application tuning parameters function
is similar to function (T-4.20) Operators changes setup/options of EMS functions above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

2.0

1.0

1.0

1.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4.21) Operators prepare for storm conditions based on weather data and history and change recloser settings above.



T-4.20.6 Other

The Purpose of Other function
is similar to function (T-4.20) Operators changes setup/options of EMS functions above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

2.0

1.0

1.0

1.0

1.0


COMMENTS:


T-4.21 Operators prepare for storm conditions based on weather data and history and change recloser settings

The Purpose of Operators prepare for storm conditions based on weather data and history and change recloser settings function
is to make reclosers less sensitive during storm
directly involving

Operator

SCADA/EMS

Field devices

performing

Change recloser settings

with key interfaces between

SCADA/EMS and recloser

with communication configuration requirements of

WAN/LAN

Lmited access sites

with quality of service requirements of

Availability

Fast response

with security requirements of

Authentication

Confidentiality

Non-repudiation

with data management requirements of

Large numbers of devices

with constraints of

Legacy systems in place; or may not be automated at all


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

3.0

2.0

2.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.


The following comments were collected during the team rating review:


Constraints=3 legacy or no system in place


Why is the rating for Security 3? The rating for Constraints does not match the comments (=3). -- Peter Sanza - 05 Apr 2003


T-4.22 Operators prepare for storm conditions based on weather data and history and change alarm thresholds

The Purpose of Operators prepare for storm conditions based on weather data and history and change alarm thresholds function
is to reduce amount of alarm information directed at operator during storm
directly involving

Operator

SCADA/EMS

performing

Change alarm thresholds

with communication configuration requirements of

N/a

with security requirements of

Authentication

Confidentiality

Non-repudiation


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

1.0

2.0

2.0

1.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.


The following comments were collected during the team rating review:


Security=1 changing alarm thresholds not, as critical



T-4.23 Prepare for transformer clipping (e.g. Solar wind/Solar Magnetic Disturbance raising ground DC offset)

The Purpose of Prepare for transformer clipping (e.g. Solar wind/Solar Magnetic Disturbance raising ground DC offset) function
is to make protection equipment more sensitive to overloads
directly involving

Operator

SCADA/EMS

Field devices

performing

Change protection settings

with key interfaces between

SCADA/EMS and protection devices

with communication configuration requirements of

N/a

with quality of service requirements of

Availability

Fast response

with security requirements of

Authentication

Confidentiality

Non-repudiation

with data management requirements of

Large numbers of devices

with constraints of

May not be able to remotely adjust settings currently


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

3.0

2.0

2.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.


The following comments were collected during the team rating review:


Security=3 changing settings

Constraints=3 issues changing settings w/ present systems



T-5 Network Analysis (real-time)

The Purpose of Network Analysis (real-time) function
is to see details below

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

2.0

3.0

2.0

3.0

2.2


COMMENTS:
The following comments were collected during the team rating review:


Qos=2 real time performance

Security=3 exchanging data with other utilities

Data Mgmt=2 large volumes of real time data

Constraints=3 legacy systems and future system performance requirements



T-5.1 EMS system performs model update, state estimation, bus load forecast

The Purpose of EMS system performs model update, state estimation, bus load forecast function
is to

Provide operations personel with state estimation to validate the quality of the SCADA

Maintains bus load forecast via adaptive update from state estimator solution


directly involving

SCADA

Schedule information

performing

Validate the quality of SCADA telemetry and generate a base case for further network analysis

with key interfaces between

Operations personnel have direct access to the online EMS system, which contains network applications, that provide state estimation and automatically updates/maintains the historical bus load forecasts

with data management requirements of

Historicall archived state estimte solution - share estimated value with the ISO/RTO

with constraints of

Telemetry data and scheuled inforation (load foarcast

Accepted generation bids

Outag management schedules)


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

2.0

3.0

2.0

3.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-5) Network Analysis (real-time) above.



T-5.2 EMS system performs contingency analysis, recommends preventive and corrective actions

The Purpose of EMS system performs contingency analysis, recommends preventive and corrective actions function
is to Contingency Analysis and post-contingency analysis remedial action provides the ability to correct problems caused by harmful contingencies caused by outages/inages or changes in generation
directly involving

Result from contengency analysis is analyised by post contengency optimal power flow

performing

Optimaization to mitigate harmfull contengency

with key interfaces between

Operations personnel and control center planning personnel have direct access to the online EMS system which contains network applications that provides real-time and study contingency analysis used in determining harmful

The network applications may then interface to available network optimization applications to determine corrective actions to either remedy harmful contingencies or prevent the harmful contingencies from occuring

with data management requirements of

Historicall archived recommended and actual controls-control center's operator use recommended control to optimize the network

with constraints of

Electrical limit within the network (voltage limit

Line flow limits…)


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

2.0

3.0

2.0

3.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-5) Network Analysis (real-time) above.



T-5.3 EMS system performs optimal power flow analysis, recommends optimization actions

The Purpose of EMS system performs optimal power flow analysis, recommends optimization actions function
is to

Optimal Powerflow provides operations personel with recommended system changes to correct limit violations while optimizing the system for pre-defined objectives including minimizing fuel cost

Minimixing losses

Minimizing the number of controls moved or minimizing the movement in all available controls


directly involving

EMS database

State estimation SW

Field devices

performing

Optimize the network to eleminate electrial violation and best economics

with key interfaces between

Operations personnel and control center planning personnel have direct access to the online EMS system which contains network applications that provides real-time and study

Economic data for minimum cost optimization is obtained from the Market Agents Information System to retrieve bid prices for energy and consumption as well as which participants can participate in optimizing/controlling the system

with data management requirements of

Historicall archived recommended and actual controls-control center's operator use recommended control to optimize the network

with constraints of

Electrical limit within the network (voltage limit

Line flow limits…)


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

2.0

3.0

2.0

3.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-5) Network Analysis (real-time) above.



T-5.4 EMS system or planners perform stability study of network

The Purpose of EMS system or planners perform stability study of network function
is to determine whether network is operating close to limits of stability
directly involving

Planners

EMS system

Field devices

performing

Gather current load conditions

Fault history

Condition monitoring information

Calculate capacity

Identify potential failure area

Rate netowrk stability

with key interfaces between

Planners

EMS

Fields devices

with communication configuration requirements of

LAN/WAN

with quality of service requirements of

Accuracy

Large volumes

with security requirements of

Integrity

with data management requirements of

Large databases

with constraints of

Heavy computing load; new process for many organizations


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

2.0

3.0

2.0

3.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-5) Network Analysis (real-time) above.



T-6 Real-time emergency operations (system protection level)

The Purpose of Real-time emergency operations (system protection level) function
is to see details below

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

3.0

3.0

3.0

2.0

3.0

2.8


COMMENTS:
The following comments were collected during the team rating review:


Config=3 new topologies required

QoS=3 must always be available; high speed response (less than 20 ms)

Security=3 involves control

Data Mgmt=2 need to capture high speed stream of data

Constraints=3 LARGE legacy base & new SW applications - possible sw agent applications; data consistency across DB and master and remote devices



T-6.1 Power System Protection

The Purpose of Power System Protection function
is to detect actual and incipient equipment fault conditions
directly involving

Generators

Transformers

Buses

Lines

Reactors

Capacitors

Motors

Etc

performing

Protection functions to correctly determining the faulted section of the power system and isolating only the faulted section

with key interfaces between

The various protective relays and the various protective relays and pilot communication equipment

with communication configuration requirements of

Auto detection of new equipment, auto-configuration of the detected equipment, and auto-verification of device virtual connections (auto-wire check). In addition, communication of performance informance with other individuals and utilities

with quality of service requirements of

Reliability and security

with security requirements of

Data integrity and confidentiality

with data management requirements of

Automatic collection and real time display of fault reports (including fault location)

Alarms (both operational and maintenance)

Oscillography

And sequence of events

And periodic collection of harmonic information

Demand data and other file information


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

3.0

3.0

3.0

2.0

3.0

2.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-6) Real-time emergency operations (system protection level) above.



T-6.2 Emergency Operations performs Under-frequency load/generation shedding

The Purpose of Emergency Operations performs Under-frequency load/generation shedding function
is to is to detect under-frequency conditions on the power system and to shed load in an effort to maintain stability of the overall system
directly involving

Under-frequency detection elements

Controllable load

And knowledge of the available load to shed

performing

Dynamic calculations of precisely the amount of load, that needs to be shed and dynamically determining exactly what control elements need to bo operated to meet the desired generation - load balance

with quality of service requirements of

Of accurate measurement of frequency

Dependable determination of the load/generation available/needed to be controlled

And reliable high-speed communication of the resultant decision to multiple locations throughout the power system


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

3.0

3.0

3.0

2.0

3.0

2.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-6) Real-time emergency operations (system protection level) above.



T-6.3 Emergency Operations performs Under-voltage load shedding

The Purpose of Emergency Operations performs Under-voltage load shedding function
is to Shed load to balance demand with available generation when voltage reaches a specified threshold
directly involving

Utility engineering staff to determine settings

Planning staff to determine location of device

performing

Shde Load

with key interfaces between

Load Shed Commands to Field Devices

with communication configuration requirements of

LAN

Point-to-Point Standard RTU/IED protocols

with quality of service requirements of

Embedded

High Availability with immediate response times to trigger detection for Underfrequency Relays, for system implementation, trigger by exception and command broadcast

with security requirements of

Standard RTU Protocol Security for System implementation

with data management requirements of

Real-Time Database Editing consistent with Master Station

with constraints of

Legacy Protocols

Communication Bandwidth

Legacy Communication Infrastructure


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

3.0

3.0

3.0

2.0

3.0

2.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-6) Real-time emergency operations (system protection level) above.



T-6.4 Emergency Operations performs Conditional localized load shedding

The Purpose of Emergency Operations performs Conditional localized load shedding function
is to

Shed load to balance demand with available generation based on peak demand periods or other conditions to reduce demand

shedding water heaters, air conditioning units, large non-critical industrial loads, etc


directly involving

Dispatcher

Planning engineering

performing

Shed Load

with key interfaces between

Load Shed Commands to Field Devices

with communication configuration requirements of

LAN

Point-to-Point Standard RTU/IED protocols

Communication to end user (residential

Commercial

And industrial)

with quality of service requirements of

High Availability

with security requirements of

Standard RTU Protocol Security for System implementation

with data management requirements of

Real-Time Database Editing consistent with Master Station

with constraints of

Legacy Protocols

Legacy Communication Infrastructure


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

3.0

3.0

3.0

2.0

3.0

2.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-6) Real-time emergency operations (system protection level) above.



T-6.5 Recovery from voltage or frequency-based load shedding

The Purpose of Recovery from voltage or frequency-based load shedding function
is to Return system to normal state after load-shedding
directly involving

Dispatcher

Planning engineering

performing

Restore system state

with key interfaces between

LTC Commands to Field Devices

with communication configuration requirements of

LAN

Point-to-Point Standard RTU/IED protocols

with quality of service requirements of

High Availability

with security requirements of

Access control

Authentication

Non-repudiation

with data management requirements of

Timely access

with constraints of

Many legacy systems


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

2.0

3.0

1.0

3.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-6) Real-time emergency operations (system protection level) above.


The following comments were collected during the team rating review:


Constraints=3 Legacy protocols



T-6.6 LTC control/blocking

The Purpose of LTC control/blocking function
is to Control of transformers Load Tap Changers for control of demand load on a feeder
directly involving

Dispatcher

Planning engineering

performing

Control Voltage/VARs

with key interfaces between

LTC Commands to Field Devices

with communication configuration requirements of

LAN

Point-to-Point Standard RTU/IED protocols

with quality of service requirements of

High Availability

with security requirements of

Standard RTU Protocol Security for System implementation

with data management requirements of

Real-Time Database Editing consistent with Master Station

with constraints of

Legacy Protocols

Legacy Communication Infrastructure


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

3.0

3.0

3.0

2.0

3.0

2.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-6) Real-time emergency operations (system protection level) above.



T-6.7 Shunt control

The Purpose of Shunt control function
is to Control of shunt capacitors/reactors to manage voltage and VARs
directly involving

Dispatcher

Planning engineering

performing

Control Voltage/VARs

with key interfaces between

Capacitor/Reactor Device Commands to Field Devices

with communication configuration requirements of

LAN

Point-to-Point Standard RTU/IED protocols

with quality of service requirements of

High Availability

with security requirements of

Standard RTU Protocol Security for System implementation

with data management requirements of

Real-Time Database Editing consistent with Master Station

with constraints of

Legacy Protocols

Legacy Communication Infrastructure


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

3.0

3.0

3.0

2.0

3.0

2.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-6) Real-time emergency operations (system protection level) above.



T-6.8 Series compensation control

The Purpose of Series compensation control function
is to

Activation of series compensation device to control Var and voltage flow

Typically applied to long transmission lines


directly involving

Dispatcher

Planning engineering

performing

Control Voltage/VARs

with key interfaces between

Series Compensators Commands to Field Devices

with communication configuration requirements of

LAN

Point-to-Point Standard RTU/IED protocols

with quality of service requirements of

High Availability

with security requirements of

Standard RTU Protocol Security for System implementation

with data management requirements of

Real-Time Database Editing consistent with Master Station

with constraints of

Legacy Protocols

Legacy Communication Infrastructure


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

3.0

3.0

3.0

2.0

3.0

2.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-6) Real-time emergency operations (system protection level) above.



T-6.9 System separation detection

The Purpose of System separation detection function
is to see Power System Control

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

3.0

3.0

3.0

2.0

3.0

2.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-6) Real-time emergency operations (system protection level) above.



T-6.10 Wide area real time instability recovery

The Purpose of Wide area real time instability recovery function
is to detect incipient power system instability conditions and implement optimal control actions to maintain system stability
directly involving

Wide area measurements of system the state

Distributed agent decision processing

And distribution of the control solution to the controlled elements in the power system

performing

Power system stability

Generation

And possibly customer loads

with key interfaces between

The substation Phasor Measurement Units (PMU)

The communication network

The decision agents

And the control agents

with communication configuration requirements of

Auto detect and auto configuration of the system devices

with quality of service requirements of

Reliable

High speed (< * 10ms) distribution of synchronized (+/- 1usec) phasor measurements to multiple locations around a power system and ensuing high-speed control decisions to multiple controlled elements around the power system (< * 10ms) with security requirements of * Information integrity and confidentiality with data management requirements of * Archiving of historic records and control actions (time tagged +/- 1ms)

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

3.0

3.0

2.0

3.0

3.0

2.8


COMMENTS:
This function has similar interfaces (and ratings) to function (T-6) Real-time emergency operations (system protection level) above.


The following comments were collected during the team rating review:


QoS=3 Time critical data delivery; Security=2 No false trips

Data Management=3 continuous HS data stream



T-6.11 Operators manage emergency alarms

The Purpose of Operators manage emergency alarms function
is to Presentation of emergency alarm to responsible Operator(s) assigned to manage the specific alarms

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.



T-6.12 SCADA/EMS aids operators in locating fault

The Purpose of SCADA/EMS aids operators in locating fault function
is to increase speed of restoration by estimating location of fault
directly involving

Operator

SCADA/EMS

Field devices

performing

Display distance to fault and likely direction of fault, as measured by multiple locations

with key interfaces between

SCADA/EMS and field devices; transmission and distribution networks

with communication configuration requirements of

WAN/LAN

Limited access

with quality of service requirements of

Availability

Accuracy

Fast response

with security requirements of

Authentication

Integrity

with data management requirements of

Timely access

with constraints of

Many devices do not gather or calculate this data yet


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.


The following comments were collected during the team rating review:


Applications and devices just being deployed now


The following comments were collected during the peer review:


Note: many devices do not support fault location



T-6.13 Operators dispatch field crews for restoration

The Purpose of Operators dispatch field crews for restoration function
is to restore faulted line
directly involving

Operator

Field crews

Work management system

performing

Identify task to be done; location of fault

with key interfaces between

SCADA/EMS and work management system

with communication configuration requirements of

WAN/LAN

Mobile

with quality of service requirements of

Availability

Fast response

with security requirements of

Authentication

Non-repudiation

Confidentiality

with data management requirements of

Timely access; may cross organizational boundaries

with constraints of

Currently manual process in many organizations


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.


The following comments were collected during the team rating review:


Manual process now



T-6.14 SCADA system performs intelligent alarm processing

The Purpose of SCADA system performs intelligent alarm processing function
is to

Evaluate related alarm(s) to determine the true alarm condition

In effect provides for an adaptive and intelligent alarm filter scheme


directly involving

SCADA/EMS

Dispatcher

Emergency crews

performing

Alarm Processing

with key interfaces between

Dispatcher

with communication configuration requirements of

WAN

LAN

with quality of service requirements of

High Availability

Fast Response

High Volume

Event Driven

with security requirements of

User Permission and System Partition (Area of Responsibility)

with data management requirements of

Historical Archiving

with constraints of

System constrained under Alarm Stress conditions


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.



T-6.15 Local alarm reduction within substation

The Purpose of Local alarm reduction within substation function
is to

Limit the alarms being displayed to the operator so the operator takes action on root causes only

Not symptoms


directly involving

Operator

GUI

IEDS within a substation

performing

Suppress alarms

with key interfaces between

Operator GUI; SCADA/EMS and devices within substation

with communication configuration requirements of

Possible LAN

with quality of service requirements of

High Availability

Fast Response

High Volume

Event Driven

with security requirements of

Access control

with data management requirements of

Historical archiving

with constraints of

New process in many organizations


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.


The following comments were collected during the team rating review:


Software to do this not widely deployed yet



T-6.16 Centralized alarm reduction based on events from multiple substations

The Purpose of Centralized alarm reduction based on events from multiple substations function
is to

Limit the alarms being displayed to the operator so the operator takes action on root causes only

Not symptoms


directly involving

Operator

GUI

IEDs and data concentrators from several substations

performing

Suppress alarms

with key interfaces between

Operator GUI; SCADA/EMS and devices in multiple substations

with communication configuration requirements of

WAN

LAN

with quality of service requirements of

High Availability

Fast Response

High Volume

Event Driven

with security requirements of

Access control

with data management requirements of

Historical archiving

with constraints of

New process in many organizations


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.



T-6.17 SCADA system performs disturbance monitoring analysis (including fault location)

The Purpose of SCADA system performs disturbance monitoring analysis (including fault location) function
is to Monitoring, collection and presentation of selected electrical network parameters prior to, during and following a disturbance period(s). The collected data is used for analysis purposed to determine the electrical network reaction to abnormal conditions
directly involving

SCADA/EMS

Dispatcher

Emergency crews

performing

Alarm Processing

with key interfaces between

Dispatcher

with communication configuration requirements of

WAN

LAN

with quality of service requirements of

High Availability

Fast Response

High Volume

Event Driven

with security requirements of

User Permission and System Partition (Area of Responsibility)

with data management requirements of

Historical Archiving

with constraints of

System constrained under Alarm Stress conditions


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

3.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.


The following comments were collected during the team rating review:


Constraints=3 does not exist in many systems



T-6.18 SCADA/EMS performs dynamic limit calculations for transformers and breakers based on real time data from equipment monitors

The Purpose of SCADA/EMS performs dynamic limit calculations for transformers and breakers based on real time data from equipment monitors function
is to Modification of device limits based on system and environmental conditions
directly involving

SCADA/EMS Dispatcher

Planning and Engineering Staff

performing

System Parameter Processing and Presentation

with key interfaces between

Dispatcher

with communication configuration requirements of

WAN

LAN

with quality of service requirements of

High Availability

Fast Response

High Volume

Event Driven

with security requirements of

User Permission and System Partition (Area of Responsibility)

with data management requirements of

Historical Archiving

with constraints of

System constrained under Alarm Stress conditions


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

3.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-6.17) SCADA system performs disturbance monitoring analysis (including fault location) above.


The following comments were collected during the team rating review:


Constraints=3 does not exist in many systems



T-6.19 SCADA/EMS performs pre-arming of fast acting emergency automation

The Purpose of SCADA/EMS performs pre-arming of fast acting emergency automation function
is to Provide pre-defined actions to defined contingencies based on present electrical network conditions
directly involving

SCADA/EMS

Dispatcher

Database Administrator

Planning Staff

performing

Limit Calculations

with key interfaces between

Dispatcher

EMS system

And field RTUs

with communication configuration requirements of

WAN

LAN

with quality of service requirements of

High Availability

Fast Response

High Volume

Event Driven

with security requirements of

User Permission and System Partition (Area of Responsibility)

with data management requirements of

Historical Archiving


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

3.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-6.17) SCADA system performs disturbance monitoring analysis (including fault location) above.



T-6.20 SCADA/EMS generates signals for emergency support by Distribution Utilities (according to the T&D contracts)

The Purpose of SCADA/EMS generates signals for emergency support by Distribution Utilities (according to the T&D contracts) function
is to missing purpose
directly involving

SCADA/EMS

Engineering and Planning Staff

Customer Staff

performing

Determination of Contingency Actions and Activation of the Action for Contingencies defined

with key interfaces between

Closed Loop with SCADA/EMS

RTU

IEDs

with communication configuration requirements of

WAN

LAN

with quality of service requirements of

High Availability

Fast Response

Event Driven

with data management requirements of

Validation of and propagation of predefined actions

with constraints of

Distributed Logic

Communication Bandwidth


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.


This function is missing a purpose statement. -- Peter Sanza - 05 Apr 2003


T-6.21 Emergency voltage and var control for providing dispatchable real and/or reactive loads

The Purpose of Emergency voltage and var control for providing dispatchable real and/or reactive loads function
is to Control of resistive loads within the electrical network by voltage and Var adjustments without severely impacting inductive loads

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

3.0

2.0

2.0

2.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.


The following comments were collected during the team rating review:


QoS=3 Time critical data delivery


This function is missing most of its description but is similar to function 6.20 -- can they be merged? -- Peter Sanza - 05 Apr 2003


T-6.22 Emergency load re-balancing between T/D substations by feeder reconfiguration

The Purpose of Emergency load re-balancing between T/D substations by feeder reconfiguration function
is to Perform control of transformer taps and feeder re-sectionalization to balance three phases or transformer loads
directly involving

SCADA/EMS

Dispatchers

Planning and Engineering Staff

performing

Demand Control

with key interfaces between

EMS and Field Devices

with communication configuration requirements of

LAN

Point-to-Point Standard RTU/IED protocols

with quality of service requirements of

High Availability

with security requirements of

Standard RTU Protocol Security for System implementation

with data management requirements of

Real-Time Database Editing consistent with Master Station

with constraints of

Legacy Protocols

Legacy Communication Infrastructure


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.



T-6.23 Activation of interruptible/curtailable load

The Purpose of Activation of interruptible/curtailable load function
is to

Control of non-essential loads in residential

Commercial or industry properties to minimizing demand loads during normal conditions and peak demand conditions


directly involving

SCADA/EMS

RTUs

IEDs Planning and Engineering Staff

performing

Demand Control for Selective Feeder

with key interfaces between

EMS and Field Devices

with communication configuration requirements of

LAN

Point-to-Point Standard RTU/IED protocols

RTU and IED Peer-to-Peer Communication

with quality of service requirements of

High Availability

with security requirements of

Standard RTU/IED Protocol Security for System implementation

with data management requirements of

Real-Time Database Editing consistent with Master Station

Downloading of Configuration Parameters to the Field Devices

with constraints of

Legacy Protocols

Legacy Communication Infrastructure


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.



T-6.24 Activation of direct load control

The Purpose of Activation of direct load control function
is to

The facility to control residential

Commercial and industrial loads remotely


directly involving

SCADA/EMS

Engineering and Planning Staff

Customer Staff

performing

Demand Control

with key interfaces between

EMS and Field Devices

with communication configuration requirements of

LAN

Point-to-Point Standard RTU/IED protocols

with quality of service requirements of

High Availability

with security requirements of

Standard RTU/IED Protocol Security for System implementation

with data management requirements of

Real-Time Database Editing consistent with Master Station

Downloading of Configuration Parameters to the Field Devices

with constraints of

Legacy Protocols

Legacy Communication Infrastructure


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.



T-6.25 Activation of distributed resources

The Purpose of Activation of distributed resources function
is to Activation of independent power producers to balance demand and available generation
directly involving

SCADA/EMS

Engineering and Planning Staff

Customer Staff

performing

Demand Control

with key interfaces between

EMS and Field Devices

with communication configuration requirements of

LAN

Point-to-Point Standard RTU/IED protocols

with quality of service requirements of

High Availability

with security requirements of

Standard RTU/IED Protocol Security for System implementation

with data management requirements of

Real-Time Database Editing consistent with Master Station

Downloading of Configuration Parameters to the Field Devices

with constraints of

Legacy Protocols

Legacy Communication Infrastructure


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.



T-6.26 Activation of other load management functions

The Purpose of Activation of other load management functions function
is to Activation of a rotating blackouts to reduce demand for electrical power
directly involving

SCADA/EMS

Engineering and Planning Staff

Independent Power Producer

performing

Generation Control

with key interfaces between

EMS system and Field Devices

with communication configuration requirements of

LAN

Point-to-Point Standard RTU/IED protocols

with quality of service requirements of

High Availability

with security requirements of

Standard RTU/IED Protocol Security for System implementation

with data management requirements of

Real-Time Database Editing consistent with Master Station

Downloading of Configuration Parameters to the Field Devices

with constraints of

Legacy Protocols


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.



T-6.27 Operators performs system restorations based on system restoration plans prepared (authorized) by operation management

The Purpose of Operators performs system restorations based on system restoration plans prepared (authorized) by operation management function
is to The procedure of restoring the electrical network from a complete or partial power failure without the introduction of other transient or static disturbances
directly involving

SCADA/EMS

Dispatchers

Engineering and Planning Staff

Customer Staff

performing

Demand Control

with key interfaces between

Operators

EMS system

Restoration plan

Field and generator RTUs

with communication configuration requirements of

LAN

Point-to-Point Standard RTU/IED protocols

with quality of service requirements of

High Availability

with security requirements of

Standard RTU/IED Protocol Security for System implementation

with data management requirements of

Real-Time Database Editing consistent with Master Station

with constraints of

Legacy Protocols


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

2.0

2.0

2.0

2.0

2.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-4) Real-time normal operator actions (Using SCADA/EMS) above.



T-7 Post operations

The Purpose of Post operations function
is to see details below
directly involving

SCADA/EMS

Dispatchers

Engineering and Planning Staff

Customer Staff

performing

Electrical Network Restoration

with key interfaces between

Field devices

EMS operation logs

Archival database

with communication configuration requirements of

LAN

Point-to-Point Standard RTU/IED protocols

with quality of service requirements of

High Availability

with security requirements of

Standard RTU/IED Protocol Security for System implementation

with data management requirements of

Real-Time Database Editing consistent with Master Station

with constraints of

Legacy Protocols


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

1.0

1.0

2.0

2.0

1.2


COMMENTS:


T-7.1 All systems archive logs and reports

The Purpose of All systems archive logs and reports function
is to

Automatically collect

Collate

Archive

And distill all information relating to system disturbances and subsequent system responses (or lack thereof)


directly involving

All protective elements

SCADA RTUs

Fault recorders

Sequence of Event recorders

Fault locators

And condition monitoring equipment

performing

Forensic analysis on power system disturbances

with quality of service requirements of

That no data shall be lost and easily retrievable when desired


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

1.0

1.0

2.0

2.0

1.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-6.5) Recovery from voltage or frequency-based load shedding above.


The following comments were collected during the team rating review:


Data Mgmt=2 large quantities of data to manage

Constraints=2 new applications to intelligently interpret alarms



T-8 Power system equipment maintenance (mobile enabled work force)

The Purpose of Power system equipment maintenance (mobile enabled work force) function
is to see details below

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.7

1.1

1.5

1.6

1.7

1.3


COMMENTS:
The following comments were collected during the peer review:


In general - migration to e-enabled mobile work force needs to be expanded



T-8.1 Substation and Line Maintenance inlcuding operation blocking

The Purpose of Substation and Line Maintenance inlcuding operation blocking function
is to

Transmission Switching Application provides operations personnel with the ability to write and approve switching job orders ahead of time and to implement the switching jobs in real-

The Transmission Switching Application provides basic checks during switching operations to reduce or eliminate switching errors


directly involving

Control center's operators and field crews

performing

Performing actual switching operations

with key interfaces between

Operation control center's personnel

Switching plan documentation

EMS database


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

1.0

3.0

2.0

3.0

2.2


COMMENTS:
The following comments were collected during the team rating review:


Config=2 interface into overall communication system

Security=2 safety issues; wireless implementation; role based authentication; non-repudiation

Data Mgmt=2 data sync; data maintenance

Constraints=3 function does not exist in this form


The following comments were collected during the peer review:


safety policy needs to be integrated into the operation of this function - if not all similar functions; similar to transfer of authority function previously

Also need to address asset management and asset tracking



T-8.2 Periodic (time-based) maintenance

The Purpose of Periodic (time-based) maintenance function
is to prevent failure of equipment while online; meet warranty requirements
directly involving

Maintenance database; field crews

performing

Maintain equipment at intervals

with key interfaces between

N/a

with communication configuration requirements of

N/a

with quality of service requirements of

N/a

with security requirements of

N/a

with data management requirements of

N/a

with constraints of

N/a


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

0.0

0.0

0.0

0.0


COMMENTS:


T-8.3 Based on age of equipment

The Purpose of Based on age of equipment function
is to prevent failure of equipment while online
directly involving

Maintenance database; field crews

performing

Change maintenance intervals, as equipment ages; replace when nearing end of life

with key interfaces between

N/a

with communication configuration requirements of

N/a

with quality of service requirements of

N/a

with security requirements of

N/a

with data management requirements of

N/a

with constraints of

N/a


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

0.0

0.0

0.0

0.0


COMMENTS:


T-8.4 Based on predictive models driven by real-time data

The Purpose of Based on predictive models driven by real-time data function
is to predict and prevent failure of equipment while online; optimize usage of equipment
directly involving

Maintenance database; field crews; SCADA/EMS and IEDs

performing

Maintain equipment when predictive models suggest need; crews examine current condition of equipment when performing maintenance

with key interfaces between

Field crews and equipment condition data in SCADA/EMS

with communication configuration requirements of

WAN/LAN

Moblie

Limited access

with quality of service requirements of

Availability

Accuracy

with security requirements of

Authentication

Integrity

Non-repudiation

with data management requirements of

Large databases

Timely access

with constraints of

Existing sensors are compute-constrained; existing software may not be prepared to take condition monitoring data, as input


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

1.0

3.0

2.0

3.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-8.1) Substation and Line Maintenance inlcuding operation blocking above.


The following comments were collected during the team rating review:


Config=2 interfaces are different, as communication between remote database and local instantaneous status



T-8.5 Maintenance staff maintain transmission lines

The Purpose of Maintenance staff maintain transmission lines function
is to missing purpose

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

1.0

3.0

2.0

3.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-8.1) Substation and Line Maintenance inlcuding operation blocking above.


This function is missing its description. -- Peter Sanza - 05 Apr 2003


T-8.6 Request that operator block reclosing for maintenance purposes

The Purpose of Request that operator block reclosing for maintenance purposes function
is to prevent injury to maintenance staff
directly involving

Operators

Field crews

performing

Enable blocking

with key interfaces between

SCADA/EMS and mobile PC

with communication configuration requirements of

Mobile

Remote sites

with quality of service requirements of

Availability

with security requirements of

Authentication

Non-repudiation

with data management requirements of

Timely access

with constraints of

Usually done by voice now; no media in place yet for data transmission


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

1.0

3.0

2.0

3.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-8.1) Substation and Line Maintenance inlcuding operation blocking above.


The following comments were collected during the team rating review:


New process



T-8.7 Maintenance staff provides information for updating relevant databases

The Purpose of Maintenance staff provides information for updating relevant databases function
is to automatically detect changes of device configurations in the field
directly involving

New device configurations and device configuration databases

performing

Auto detection of changes and auto update of database information

with key interfaces between

Device configuration tables and database software

with communication configuration requirements of

Auto configuration of database including auto-detection of new devices and auto detection of device configuration changes

WAN/LAN

Remote sites

Mobile

with quality of service requirements of

Infrequent updates

with security requirements of

Data integrity and confidentiality

with data management requirements of

Automatic interface with the configuration database


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

1.0

3.0

2.0

3.0

2.2


COMMENTS:
This function has similar interfaces (and ratings) to function (T-8.1) Substation and Line Maintenance inlcuding operation blocking above.



T-8.8 Maintenance staff refer to substation drawings (online)

The Purpose of Maintenance staff refer to substation drawings (online?) function
is to ensure maintenance staff have most up-to-date information before performing work
directly involving

Equipment database

Field crews

performing

Automatic download of drawings to mobile devices

with key interfaces between

Equipment database

Hand-held PCs

with communication configuration requirements of

WAN/LAN

Mobile

Remote sites

with quality of service requirements of

Availability

Accuracy

Infrequent

Large volumes

with security requirements of

Authentication

Confidentialty

Non-repudiation

with data management requirements of

Large databases

with constraints of

Infrastructure not yet in place


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

3.0

1.0

3.0

3.0

2.4


COMMENTS:
The following comments were collected during the team rating review:


QoS=3 high volume of data

Data Mgmt=3 more complicated data filesNew

Constraints=2 relatively new process

Config = 2


Why is the rating for Configuration 2? The rating for Constraints does not match the comments (=2). -- Peter Sanza - 05 Apr 2003


T-9 SCADA/EMS Maintenance

The Purpose of SCADA/EMS Maintenance function
is to see details below

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

3.0

2.0

3.0

3.0

2.6


COMMENTS:
The following comments were collected during the team rating review:


config=2 networking multiple sites; working with primary/backup systems at multiple sites

QoS=3 high availability security=2 inter-site communications need to be protected Data Mgmt=3 data sync between sites Constraints=3 legacy

to address; new paradigm to address; regulatory issues to address (

interface between transcos and gencos)


The following comments were collected during the peer review:


New paradigm of multiple and intersite maintenance



T-9.1 SCADA/EMS personnel updates SCADA/EMS databases

The Purpose of SCADA/EMS personnel updates SCADA/EMS databases function
is to

SCADA/EMS

Dispatchers

Engineering and Planning Staff

Database Administrator


directly involving

Database and Display Administration

performing

Database and Display Engineer

Dispatcher

with key interfaces between

LAN

WAN

WEB

with communication configuration requirements of

Maintenance of Database/Display Integrity

And High Volume and Incremental Changes

with quality of service requirements of

Permission and Authentication

with security requirements of

Large Source

And Real-Time Databases

Temporal Database

Batch and Incremental Updates

with data management requirements of

Heterogeneous Data Model


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

3.0

2.0

3.0

3.0

2.6


COMMENTS:
This function has similar interfaces (and ratings) to function (T-9) SCADA/EMS Maintenance above.



T-9.2 SCADA/EMS personnel updates EMS applications

The Purpose of SCADA/EMS personnel updates EMS applications function
is to

SCADA/EMS

Engineering and Planning Staff

Database Administrator


directly involving

Software Development/Maintenance

performing

Application Engineer

with key interfaces between

LAN

WAN

WEB

with communication configuration requirements of

Application Upgrade

Version Control

with quality of service requirements of

Permission and Authentication

with security requirements of

Update Operational Model

with data management requirements of

New Application

Contractual Constraints


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

3.0

2.0

3.0

3.0

2.6


COMMENTS:
This function has similar interfaces (and ratings) to function (T-9) SCADA/EMS Maintenance above.



T-9.3 SCADA/EMS personnel updates operator interfaces

The Purpose of SCADA/EMS personnel updates operator interfaces function
is to

SCADA/EMS

Dispatchers

Engineering and Planning Staff

Database Administrator


directly involving

Display Administration

performing

Database and Display Engineer

Dispatcher

with key interfaces between

LAN

WAN

WEB

with communication configuration requirements of

Maintenance of Database/Display Integrity

And High Volume and Incremental Changes

with quality of service requirements of

Permission and Authentication

with security requirements of

Display Update

And Database Update


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

3.0

2.0

3.0

3.0

2.6


COMMENTS:
This function has similar interfaces (and ratings) to function (T-9) SCADA/EMS Maintenance above.



T-9.4 SCADA/EMS personnel updates interfaces with other systems

The Purpose of SCADA/EMS personnel updates interfaces with other systems function
is to

SCADA/EMS

Engineering and Planning Staff

Database Administrator


directly involving

Configuration personnel

Multiple EMS systems

performing

Database updating

with key interfaces between

LAN

WAN

WEB

with communication configuration requirements of

LAN/WAN between multiple sites

with quality of service requirements of

Permission and Authentication


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

3.0

2.0

3.0

3.0

2.6


COMMENTS:
This function has similar interfaces (and ratings) to function (T-9) SCADA/EMS Maintenance above.



T-9.5 SCADA/EMS personnel performs diagnostics of the SCADA/EMS systems

The Purpose of SCADA/EMS personnel performs diagnostics of the SCADA/EMS systems function
is to

SCADA/EMS

Engineering Staff


directly involving

Test technichians

EMS software

Test interface

performing

Dispatcher

System Analysis

with key interfaces between

LAN

WAN

WEB

with communication configuration requirements of

WAN/LAN interfaces

with quality of service requirements of

Permission and Authentication


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

3.0

2.0

3.0

3.0

2.6


COMMENTS:
This function has similar interfaces (and ratings) to function (T-9) SCADA/EMS Maintenance above.



T-10 Operator and SCADA/EMS personnel training

The Purpose of Operator and SCADA/EMS personnel training function
is to see details below

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

1.0

2.0

2.0

1.0


COMMENTS:
The following comments were collected during the team rating review:


Data Mgmt=2 need to interface with market data

Constraints=2 need to simulate entire market

Security=1 need to make sure, that the simulator is not connected live


The following comments were collected during the peer review:


Need to look at this function in Market Ops



T-10.1 Operators and SCADA/EMS personnel perform periodic training by using the Operator Training Simulator

The Purpose of Operators and SCADA/EMS personnel perform periodic training by using the Operator Training Simulator function
is to

The Dispatcher Training Simulator provides operations personnel with the ability to learn systems operation in an offline

The Dispatcher Training Simulator provides the ability to teach system operators how to handle off-nominal conditions without impacting actual operations


directly involving

DTS and operation's trainees

performing

Operations training

with key interfaces between

Dispatcher's user interface identical to real time EMS UI, as well, as special instructor's displays

with security requirements of

Realistic operating conditions

with data management requirements of

Capture of the real time snap shot from the EMS


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

1.0

2.0

2.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-10) Operator and SCADA/EMS personnel training above.



T-10.2 Operators and SCADA/EMS personnel participate in advanced education programs

The Purpose of Operators and SCADA/EMS personnel participate in advanced education programs function
is to The Dispatcher Training Simulator provides the ability to have instructor/student sessions in a simulated real environment where the instructor has control of the scenarios under simulation
directly involving

DTS and operation's trainees

performing

Operations training

with key interfaces between

Dispatcher's user interface identical to real time EMS UI, as well, as special instructor's displays

with security requirements of

Realistic operating conditions

with data management requirements of

Capture of the real time snap shot from the EMS


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

1.0

2.0

2.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-10) Operator and SCADA/EMS personnel training above.



T-11 Engineering

The Purpose of Engineering function
is to

Create the designs necessary to analyze

Build

Test

And operate the infrastructure of the power system


directly involving

Models of the existing and proposed system composition (CIM basec??)

Existing and proposed capital improvements

And drawing

Testing

Commissioning

And monitoring tools

performing

The design of the next generation power system

with key interfaces between

The existing system design

The proposed additions

And the chosen engineering tools

with security requirements of

Confidentiality and data integrity

with data management requirements of

Auto-update of the drawing database on the change of a drawing in the field


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

1.0

2.0

2.0

1.0


COMMENTS:
The following comments were collected during the team rating review:


Data Mgmt=2 shipment of drawing (configuration) to field and automatic update of drawing changes from field into original drawing

Constraints=2 new process


The following comments were collected during the peer review:


It is expected that the substation configuration will be automatically generated from the

Changes in the drawing will automatically change the configuration of the substation equipment and in the EMS databases



T-11.1 Protection engineers perform protection engineering

The Purpose of Protection engineers perform protection engineering function
is similar to function (T-11) Engineering above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

1.0

2.0

2.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-11) Engineering above.



T-11.1.1 Duties: base case, fault studies, relay settings, protection coordination, fault analysis

The Purpose of Duties: base case, fault studies, relay settings, protection coordination, fault analysis function
is similar to function (T-11.1) Protection engineers perform protection engineering above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

1.0

2.0

2.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-11) Engineering above.



T-11.1.2 Needs data: line/equipment capacity, relay specs, PT/CT ratios, fault records, SOE data, event info (relay 'targets' - which element picked up)

The Purpose of Needs data: line/equipment capacity, relay specs, PT/CT ratios, fault records, SOE data, event info (relay 'targets' - which element picked up) function
is similar to function (T-11.1) Protection engineers perform protection engineering above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

1.0

2.0

2.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-11) Engineering above.



T-11.2 Substation engineers perform substation engineering

The Purpose of Substation engineers perform substation engineering function
is similar to function (T-11) Engineering above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

1.0

2.0

2.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-11) Engineering above.



T-11.3 Transmission engineers perform transmission line engineering

The Purpose of Transmission engineers perform transmission line engineering function
is similar to function (T-11) Engineering above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

1.0

2.0

2.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-11) Engineering above.



T-11.4 Engineering staff provides information for updating relevant databases - from site / online

The Purpose of Engineering staff provides information for updating relevant databases - from site / online function
is similar to function (T-11) Engineering above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

1.0

2.0

2.0

1.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-11) Engineering above.



T-12 Construction management

The Purpose of Construction management function
is to

Monitor assets

Construction schedule

And to perform personnel task assignment


directly involving

All previously mentioned entities

performing

Automated management of the described aspects

with key interfaces between

Engineering

Engineering drawings

And testing

with security requirements of

Data integrity

with data management requirements of

hedge against loss (

- off site archival)


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

0.0

0.0

0.0

0.0


COMMENTS:


T-12.1 Construction managers manage asset purchasing

The Purpose of Construction managers manage asset purchasing function
is similar to function (T-12) Construction management above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

0.0

0.0

0.0

0.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-12) Construction management above.



T-12.2 Construction managers plan construction projects

The Purpose of Construction managers plan construction projects function
is similar to function (T-12) Construction management above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

0.0

0.0

0.0

0.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-12) Construction management above.



T-12.3 Construction managers manage crew assignments

The Purpose of Construction managers manage crew assignments function
is similar to function (T-12) Construction management above.

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

0.0

0.0

0.0

0.0

0.0

0.0


COMMENTS:
This function has similar interfaces (and ratings) to function (T-12) Construction management above.



T-12.4 Construction personnel provides information for updating relevant databases - from the site / online

The Purpose of Construction personnel provides information for updating relevant databases - from the site / online function
is to missing purpose

On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

1.0

1.0

1.0

1.0

1.0

1.0


COMMENTS:

This function is missing a description. -- Peter Sanza - 05 Apr 2003


T-12.5 Construction personnel refer to substation drawings (online)

The Purpose of Construction personnel refer to substation drawings (online?) function
is to ensure construction crews have most up-to-date information before performing work
directly involving

Equipment database

Field crews

performing

Automatic download of drawings to mobile devices

with key interfaces between

Equipment database

Hand-held PCs

with communication configuration requirements of

WAN/LAN

Mobile

Remote sites

with quality of service requirements of

Availability

Accuracy

Infrequent

Large volumes

with security requirements of

Authentication

Confidentialty

Non-repudiation

with data management requirements of

Large databases

with constraints of

Infrastructure not yet in place


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

1.0

2.0

1.0

1.0

1.4


COMMENTS:
The following comments were collected during the team rating review:


Security=2 protect integrity of drawings over wireless comms



T-13 Black Start

The Purpose of Black Start function
is to bring the power system back to life after a total system blackout
directly involving

EMS/SCADA Controlers

Generators

Substations RTUs

Distribution controls

performing

Either manual restoration or pre-programmed switching, that will permit the sequenced re-energization of the transmission grid

with key interfaces between

SCADA and all remote nodes

with communication configuration requirements of

One to many/ WAN

with quality of service requirements of

high availability (

- must function on loss of AC power), data integrity

with security requirements of

Information integrity and confidentiality

with data management requirements of

Accessing automatic sequencing logic

with constraints of

Interfacing with legacy systems and future agent based restoration systems


On a scale of 0 (does not involve significant architectural challenges) to 3 (highly likely to involve architectural challenges) this function was rated as follows:

Configuration

Quality of Service

Security

Data Management

Constraints

Average

2.0

3.0

2.0

1.0

2.0

2.0


COMMENTS:
The following comments were collected during the team rating review:


Config=2 must reach all controllable substations

QoS=3 contrl and communication system must operate w/ no AC power - high availability

Security=3 must not be able to stop messages fromf arriving

Constraints=2 legacy support


The following comments were collected during the peer review:


Appears in other domains and should be normalized


The rating for Security does not match the comment (=3). -- Peter Sanza - 05 Apr 2003

 

IntelliGrid Architecture