Market Operations – Medium and Short Term Planning

Narrative

As the electricity industry is deregulated, and as FERC defines more clearly what the market operation tariffs will encompass, three possible Regional Transmission Organizations (RTOs) in the Western Interconnection are developing seamless interfaces for Market Participants to submit energy schedules and ancillary service bids across these 3 RTOs. The 3 RTOs are California ISO (existing ISO handling the electricity market in California), RTO West (potential RTO of many northwestern utilities), and WestConnect (potential RTO of many southwestern utilities). These 3 RTOs are developing the requirements for the Western RTO functions.

The following is a list of Western RTO functions related to medium and short term planning for market operations. The four functions with asterisks are described in this document.

1.        Medium/Short Term Planning

a.        Load Forecast *

b.       Outage Scheduling *

c.        Congestion Management *

d.       Long term Auction/sale of Transmission Rights *

e.        Bilateral Energy Market

Load Forecasts (LF)

Description - Load Forecast

The purpose of RTO/ISO/TransCos/DisCos Forecast Load function is to provide load MW estimates for each region and local area, based on energy schedules, weather forecasts, historical load shapes, forecast special events, and expected new loads at their connection points , directly involving RTOs, transmission owners, distribution companies, National Weather Services, Market Participants, Energy Service Providers, and Customers, performing regional and local load forecasts for different time periods, updating the precision of the forecasts, as each time period approaches, with key interfaces between

1. all three types of utilities: RTOs, transmission owners, and distribution companies

2. Utilities and National Weather Services

3. RTOs and Market Participants

4. DisCos and Energy Service Providers

5. DisCos and Customers,

Diagram - Load Forecast

 

Steps - Load Forecast

 

#

Event

Name of Process/Activity

Description of
Process/Activity

Information Producer

Information
Receiver

Name of Info Exchanged

IntelliGrid Architecture Environments

1.1a

Periodic or event driven

Load estimates

Provides load MW estimates from Day Ahead schedules as an auxiliary source of LF data

Scheduling Coordinator

7-day Load Forecast

Load estimates

User Interface

1.1b

In parallel to step 1a

Forecast weather

Provides weather forecasts and updates for each region

Weather Service

7-day Load Forecast

Weather data

Control Center to Corporate

1.1c

In parallel to step 1a

Regional loads

Provides regional LF estimates as auxiliary source of LF data

Transmission Owner

7-day Load Forecast

Load estimates

Inter-Control Center

1.1d

In parallel to step 1a

Historical forecasts

Provides historical input for forecast

Historic Load Database

7-day Load Forecast

Historical forecasts

Intra-Control Center

1.2

Upon completion of previous step

Adjust forecasts

Adjusts load forecast

RTO Scheduler

7-day Load Forecast

Adjustments

User Interface

1.3

Upon completion of previous step

Issue load forecasts

Provides 7-day regional load forecasts

7-day Load Forecast

Market Participant

Load forecasts

RTOs/Market Participants

 

Outage Scheduling (OS)

Description

The purpose of Outage Scheduling by TransCos and GenCos is to propose scheduled transmission and generation outages which are validated via the Congestion Management Analysis function (see below) to determine if any major conflicts exist that could cause power system problems.

 

Diagram

 

Steps

#

Event

Name of Process/Activity

Description of
Process/Activity

Information Producer

Information
Receiver

Name of Info Exchanged

IntelliGrid Architecture Environments

2.1a

As needed before a specific day and time when maintenance coordination is to be performed

Send generation outages

(1a) Send Day Ahead Local Generation Resources (LGR) outages, limit and ramp rate changes, and notification of non-LGR units

Scheduling Coordinator

LGR Generation Maintenance Schedule

Generation outages

RTOs/Market Participants

2.1b

In parallel to step 1a

Send transmission outages

(1b) Request Day Ahead transmission maintenance outages

Transmission Owner

Transmission Outage Schedule

Transmission outages

Inter-Control Center

2.1c

In parallel to step 1a

Send other RTO transmission outages

(1c) Notify of relevant transmission outages

Other 2 RTOs

Transmission Outage Schedule

Transmission outages

Inter-Control Center

2.2a

On the specific day and time

Provide outage schedules

(2a) Provide proposed outage schedules

LGR Generation Maintenance Schedule

Maintenance Outage Function

Generation outages

Intra-Control Center

2.2b

In parallel to step 2a

Provide outage schedules

(2b) Provide proposed outage schedules

Transmission Outage Schedule

Maintenance Outage Function

Transmission outages

Intra-Control Center

2.3a

On the specific day and time

Provide energy schedules

(3a) Provide proposed energy schedules

Energy Schedule Database

Maintenance Outage Function

Energy schedules

Intra-Control Center

2.3b

In parallel to step 3a

Provide load forecast

(3b) Provide 7-day load forecasts for each region

7-day Load Forecast

Maintenance Outage Function

Load forecasts

Intra-Control Center

2.4

After previous step

Review outages

(4) Reviews result of Maintenance Outages

Maintenance Outage Function

RTO Scheduler

Generation outages

Transmission outages

User Interface

2.5a

When RTO Scheduler analyzes the impact of outages

Analysis of LGR outages

(5a) Approves or rejects LGR outage

RTO Scheduler

LGR Generation Maintenance Schedule

Indication of approval and rejection of LGR maintenance schedules

User Interface

2.5b

In parallel to step 5a

Analysis of transmission outages

(5b) Approves or rejects transmission outage schedules

RTO Scheduler

Transmission Outage Schedule

Indication of approval and rejection of transmission outage schedules

User Interface

2.6a

After previous step

Notify LGR owners

(6a) Notify LGR Owner of approvals and rejections

LGR Generation Maintenance Schedule

Scheduling Coordinator

Indication of approval and rejection of LGR maintenance schedules

RTOs/Market Participants

2.6b

In parallel to step 6a

Notify transmission owners

(6b) Notify TO of approvals and rejections

Transmission Outage Schedule

Transmission Owner

Indication of approval and rejection of transmission outage schedules

Inter-Control Center

2.6c

In parallel to step 6a

Warnings on contingencies

(6c) Warn of potential contingencies

Transmission Outage Schedule

Other 2 RTOs

Contingency warnings

Inter-Control Center

 

Congestion Management (CM)

Description

RTO/ISOs must perform congestion management and security analysis on submitted energy schedules (depending on market design), focusing on the impact of the proposed energy on system conditions, in order to determine probable ancillary services and any violations of power system security conditions.

Diagram

 

 

Steps

#

Event

Name of Process/Activity

Description of
Process/Activity

Information Producer

Information
Receiver

Name of Info Exchanged

IntelliGrid Architecture Environments

3.1a

Periodically and/or at specific times and dates

Update constraints

(1a) Update transmission path constraints for each future hour

Transmission Owner

Transmission System Characteristics Database

Future constraints

Inter-Control Center

3.1b

In parallel to step 1a

Update constraints

(1b) Provide real-time data on transmission constraints and outages

Data Acquisition and Control (DAC) Subsystem

Transmission System Characteristics Database

Real-time constraints

Intra-Control Center

3.1c

In parallel to step 1a

Update constraints

(1c) Update relevant transmission path constraints for each future hour

Other 2 RTOs

Transmission System Characteristics Database

Future and real-time constraints

Inter-Control Center

3.2a

Periodically or upon request or upon event

Provide FTRs

(2a) Provide list of Firm Transmission Rights (FTR) Interfaces and Scheduling Points

Transmission Right Ownership Database

Congestion Management System

FTRs

Intra-Control Center

3.2b

In parallel to step 2a

Provide transmission outages

(2b) Provide approved transmission outage schedules for the appropriate timeframes

Transmission Outage Schedule

Congestion Management System

Transmission outage schedules

Intra-Control Center

3.2c

In parallel to step 2a

Provide LGR outage schedules

(2c) Provide approved LGR outage schedules for the appropriate timeframes

LGR Generation Maintenance Schedule

Congestion Management System

LGR outage schedules

Intra-Control Center

3.2d

In parallel to step 2a

Provide transmission conditions

(2d) Provide update of transmission conditions for the appropriate timeframes

Transmission System Characteristics Database

Congestion Management System

Transmission conditions

Intra-Control Center

3.3

Periodically

Calculate TTC, ATC, and OTC

(3) Calculate TTC, ATC, and OTC for each FTR Interface and Scheduling Point

Congestion Management System

Operational Transmission Capacity

TTC, ATC, & OTC

Intra-Control Center

3.4

Upon request

Review OTC

(4) Review OTC data

Operational Transmission Capacity

RTO Scheduler

OTC

User Interface

3.5

By specific date and time

Approve OTC

(5) Approve OTC data

RTO Scheduler

Operational Transmission Capacity

OTC approvals

User Interface

3.6a

By specific data and time

Updated OTC

(6a) Provide updated TTC, ATC, and OTC data

Operational Transmission Capacity

WMI Web Server

TTC, ATC, & OTC

RTOs/Market Participants

3.6b

In parallel to step 6a

Calculate FDF

(6b) Provide updated Flow Distribution Factors (FDF)

FTR Requirements Matrix

WMI Web Server

FDF

RTOs/Market Participants

3.6c

In parallel to step 6a

Updated OTC

(6c) Provide updated TTC, ATC, and OTC data

Operational Transmission Capacity

Other 2 RTOs

TTC, ATC, & OTC

Inter-Control Center

3.7

At specific date and time

Provide TTC, ATC, and OTC

(7) Provide TTC. ATC, OTC, and FDF data to Market Participants

WMI Web Server

Market Participant

TTC, ATC, & OTC

RTOs/Market Participants

 

Long Term Auction of Transmission Rights (LTATR)

Description

Scheduling Coordinators can participate in the auction for transmission rights, dependent on the market rules.

Diagram

 

Steps for Long Term Auction of Transmission Rights

 

#

Event

Name of Process/Activity

Description of
Process/Activity

Information Producer

Information
Receiver

Name of Info Exchanged

IntelliGrid Architecture Environments

4.0

As needed

Input schedules

(As needed) Input schedules for legal existing contractual agreements

RTO Programmer Engineer Personnel

Existing Transmission Contracts

Transmission contracts

User Interface

4.1

Periodically or at specific time and date

Provide OTC

(1) Provide capacity needed for existing contracts

Existing Transmission Contracts

Operational Transmission Capacity

Transmission contracts

Intra-Control Center

4.2

After previous step

Calculate FTR

(2) Calculate conservative FTR from OTC minus previously auctioned FTRs, minus existing contracts

Operational Transmission Capacity

Available FTR

OTC

Intra-Control Center

4.3

At specific time and date

Trigger posting of FTR

(3) Trigger posting of FTRs

Time Line Manager

Available FTR

Trigger

RTOs/Market Participants

4.4

At specific time and date

Post FTR

(4) Post available FTRs, transmission outage schedules, & generation maintenance schedules

Available FTR

WMI Web Server

FTR

RTOs/Market Participants

4.5a

On-going

Enter bids

(5a) Enter bids for FTRs

Scheduling Coordinator

WMI Web Server

Bids for FTR

RTOs/Market Participants

4.5b

In parallel to step 5a

Enter bids

(5b) Enter bids for FTRs

Eligible Customers

WMI Web Server

Bids for FTR

RTOs/Market Participants

4.6

Before auction time

Receive bids

(6) Receive FTR bids during auction

WMI Web Server

FTR Market Clearing Price Auction Function

Bids for FTR

RTOs/Market Participants

4.7

At auction time

Trigger auction

(7) Trigger auction function

Time Line Manager

FTR Market Clearing Price Auction Function

Trigger

Intra-Control Center

4.8a

After previous step

Post FTR winners

(8a) Post winners of FTR auction after auction close

FTR Market Clearing Price Auction Function

WMI Web Server

FTR winners

RTOs/Market Participants

4.8b

In parallel to step 8a

Store FTRs

(8b) Store ownership of FTRs

FTR Market Clearing Price Auction Function

Transmission Right Ownership Database

FTR owners

Intra-Control Center

4.9a

After previous step

Notify winners

(9a) Notify winners (and losers) of FTR

WMI Web Server

Scheduling Coordinator

FTR winners

RTOs/Market Participants

4.9b

In parallel to step 9a

Notify winners

(9b) Notify winners (and losers) of FTR

WMI Web Server

Eligible Customers

FTR winners

RTOs/Market Participants

4.9c

In parallel to step 9a

Provide FTR information

(9c) Provide FTR information to RTOs

WMI Web Server

Other 2 RTOs

FTR winners

RTOs/Market Participants

 

 

 

 

IntelliGrid Architecture
Copyright EPRI 2004