IntelliGrid Architecture

 

 

Home

Parent Menu

Same Level Menu

Child Menu

 

Search IntelliGrid Site

Questions/Comments

Questions

 

Responses

 

 

IEC60870-5 Part 104 - Telecontrol Protocol over TCP/IP

URL:      http://trianglemicroworks.com/mailman/listinfo/iec60870-5_trianglemicroworks.com

IEC60870-5 Part 104 was developed by IEC TC57 in WG03 as an international standard, by placing IEC60870-5 Part 101 over the TCP/IP Protocol stack. This permits networking of the communications for monitoring and controlling field devices through SCADA. This has made it less useful for compute constrained devices and media-constrained communications, but has made it significantly more useful for less constrained environments. It is equivalent to DNP when it runs over the TCP/IP.

A complete description of the 60870-5 parts can be found in IEC60870-5 Part 101 Description.

Keywords:            Protocol, Standard, Monitoring, Control, Protection, Physical layer, Data link layer, Application layer, Serial, Power industry

DNP

IntelliGrid Architecture
Copyright EPRI 2004

Home
IntelliGrid Project
Power Functions
Strategic Vision
Environments
Security Issues
Technical Analysis
Tech1
Tech2
Other Links