IntelliGrid Architecture

 

 

Home

Parent Menu

Same Level Menu

Child Menu

 

Search IntelliGrid Site

Questions/Comments

Questions

 

Responses

 

 

IEC60870-5 Part 104 - Telecontrol Protocol over TCP/IP

URL:      http://trianglemicroworks.com/mailman/listinfo/iec60870-5_trianglemicroworks.com

IEC60870-5 Part 104 was developed by IEC TC57 in WG03 as an international standard, by placing IEC60870-5 Part 101 over the TCP/IP Protocol stack. This permits networking of the communications for monitoring and controlling field devices through SCADA. This has made it less useful for compute constrained devices and media-constrained communications, but has made it significantly more useful for less constrained environments. It is equivalent to DNP when it runs over the TCP/IP.

A complete description of the 60870-5 parts can be found in IEC60870-5 Part 101 Description.

Keywords:            Protocol, Standard, Monitoring, Control, Protection, Physical layer, Data link layer, Application layer, Serial, Power industry

DNP

IntelliGrid Architecture
Copyright EPRI 2004