The Integrated Energy and Communication Systems Architecture
Volume II:
Functional Requirements
Appendix B:
Stakeholders Engaged and Documents Reviewed
EPRI Project Manager
Joe Hughes
Cosponsor
Electricity Innovation Institute Consortium for Electric Infrastructure to Support a Digital Society (CEIDS)
EPRI • 3412 Hillview Avenue, Palo Alto, California
94304 • PO Box 10412, Palo Alto, California 94303 • USA
800.313.3774 • 650.855.2121 • askepri@epri.com • www.epri.com
DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES
THIS DOCUMENT WAS PREPARED BY THE ORGANIZATION(S) NAMED BELOW AS AN ACCOUNT OF WORK SPONSORED OR COSPONSORED BY THE ELECTRIC POWER RESEARCH INSTITUTE, INC. (EPRI). NEITHER EPRI, ANY MEMBER OF EPRI, ANY COSPONSOR, THE ORGANIZATION(S) BELOW, NOR ANY PERSON ACTING ON BEHALF OF ANY OF THEM:
(A) MAKES ANY WARRANTY OR REPRESENTATION WHATSOEVER, EXPRESS OR IMPLIED, (I) WITH RESPECT TO THE USE OF ANY INFORMATION, APPARATUS, METHOD, PROCESS, OR SIMILAR ITEM DISCLOSED IN THIS DOCUMENT, INCLUDING MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, OR (II) THAT SUCH USE DOES NOT INFRINGE ON OR INTERFERE WITH PRIVATELY OWNED RIGHTS, INCLUDING ANY PARTY'S INTELLECTUAL PROPERTY, OR (III) THAT THIS DOCUMENT IS SUITABLE TO ANY PARTICULAR USER'S CIRCUMSTANCE; OR
(B) ASSUMES RESPONSIBILITY FOR ANY DAMAGES OR OTHER LIABILITY WHATSOEVER (INCLUDING ANY CONSEQUENTIAL DAMAGES, EVEN IF EPRI OR ANY EPRI REPRESENTATIVE HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES) RESULTING FROM YOUR SELECTION OR USE OF THIS DOCUMENT OR ANY INFORMATION, APPARATUS, METHOD, PROCESS, OR SIMILAR ITEM DISCLOSED IN THIS DOCUMENT.
ORGANIZATIONS THAT PREPARED THIS DOCUMENT
General Electric Company led by GE Global Research (Prime Contractor)
Significant
Contributions made by
EnerNex Corporation
Hypertek
Lucent Technologies (Partner)
Systems Integration Specialists Company, Inc.
Utility Consulting International (Partner)
ORDERING INFORMATION
Requests for copies of this report should be directed to EPRI Orders and Conferences, 1355 Willow Way, Suite 278, Concord, CA 94520. Toll-free number: 800.313.3774, press 2, or internally x5379; voice: 925.609.9169; fax: 925.609.1310.
Electric Power Research Institute and EPRI are registered service marks of the Electric Power Research Institute, Inc. EPRI. ELECTRIFY THE WORLD is a service mark of the Electric Power Research Institute, Inc. All other trademarks are the property of their respective owners.
Copyright © 2002, 2003, 2004 Electric Power Research Institute, Inc. All rights reserved.
This document describes research sponsored by EPRI and Electricity Innovation Institute.
The publication is a corporate document that should be cited in the literature in the following manner:
THE INTEGRATED ENERGY AND COMMUNICATION SYSTEMS ARCHITECTURE, EPRI, Palo Alto, CA and Electricity Innovation Institute, Palo Alto, CA: 2003 {Product ID Number}.
This appendix contains a summary of the stakeholder engagements that were used to gather input to the design of IntelliGrid Architecture. It should be noted, that the first table shows the “traditional” stakeholder venue where a meeting with individuals was convened and discussions and presentations were exchanged. The latter part of this appendix contains a list of the key stakeholder documents that were consulted as part of the stakeholder engagement process.
Date/Type of Engagement |
Name |
Domains and Functions
Addressed |
Stakeholder Category |
Summary of Results |
Status of Results |
ANSI C12 SC17 Meeting Presentation by Marty Burns |
Meter Vendors and Utilities
working on meter standards |
Various domains and functions |
Standards Bodies and
industry Groups |
Provided overview of IntelliGrid Architecture
project. Solicited input from audience. Engaged in general
one-on-one discussions with meeting attendees. |
Utilized as general
background information for multiple use cases. |
ASHRAE SPC134 Meeting Presentation by Marty Burns |
Building Controls and
Automation Industry members |
Various domains and
functions |
Standards Bodies Industry Groups |
Provided overview of IntelliGrid Architecture project.
Solicited input from audience. Engaged in general one-on-one
discussions with meeting attendees. |
Utilized as general
background information for multiple use cases. |
United Telecom Council
Regional Meeting Presentation by Mark Adamiak |
Telecommunications Industry |
Various domains and
functions |
Utilities Industry Groups |
Provided overview of IntelliGrid Architecture
project. Solicited input from audience. Engaged in general
one-on-one discussions with meeting attendees. |
Utilized as general
background information for multiple use cases. |
DER/ADA Stakeholder Meeting Participation by Frances
Cleveland |
Small Generation Vendors,
System Integrators, Utility Engineers |
DER-ADA |
Utilities Government Institutions Industry Groups Vendors & Suppliers |
Met with a number of
distribution and transmission utilities, DER vendors, DER integrators,
communications vendors, and consultants - Discussed DER and Distribution
Automation, to determine most important DER devices and how they were used
(planned to be used) in distribution systems. These eventually led to a list
of Use Cases that were incorporated in IntelliGrid Architecture enterprise activities. |
Individual and collective
follow-ups are progressing |
CEIDS DER Meeting Presentations by Mark Adamiak and Frances Cleveland |
Small Generation Vendors,
System Integrators, Utility Engineers |
DER-ADA |
Utilities Government Institutions Industry Groups Vendors & Suppliers |
Provided overview of IntelliGrid Architecture project.
Solicited input from audience. Engaged in general one-on-one
discussions with meeting attendees. |
Utilized as general
background information for multiple use cases. |
DER/ADA Object Modeling
Workshop Presentation by Frances
Cleveland |
Small Generation Vendors,
System Integrators, Utility Engineers |
DER-ADA |
Utilities Government Institutions Industry Groups Vendors & Suppliers |
Met with a number of
distribution and transmission utilities, DER vendors, DER integrators, communications
vendors, and consultants - Organized and clarified the DER Use Cases from
March meeting. Discussed communication requirements, including performance,
for interactions with DER devices and systems. Focused mostly on the reasons
for object models, the existing IEC61850 object models for substation
devices, and the plans for developing DER object models. |
Utilized as general
background information for multiple use cases. |
UCA User’s Group Presentation by Frances
Cleveland |
International Utilities,
Major Vendor Representatives, Utilities, Consultants |
DER-ADA WAMAC Consumer/RTP |
Utilities Vendors & Suppliers Standards Bodies |
Provided overview of IntelliGrid Architecture project.
Solicited input from audience. Engaged in general one-on-one
discussions with meeting attendees. |
Utilized as general
background information for multiple use cases. |
EPRI PQA North America Presentation by Erich
Gunther |
Vendors and Power Quality
Engineers and Consultants |
Consumer/RTP |
Utilities Vendors & Suppliers End Use Groups |
Brief 3 slide presentation
on IntelliGrid Architecture project |
Utilized as general
background information for multiple use cases. |
GE North American Executive
Advisory Council Presentation by Peter Sanza
and Mark Adamiak |
Utility Executives |
Various domains and
functions |
Utilities Vendors |
Provided overview of IntelliGrid Architecture project
to GE and utility executives. Solicited input from audience.
Engaged in general one-on-one discussions with meeting attendees. |
Utilized as general
background information for multiple use cases. |
IEEE Power Engineering
Society Power Systems Coordinating Committee Presentation by Frances
Cleveland |
Vendors, Utilities,
Consultants, Communications and Power Engineers |
DER-ADA WAMAC Consumer/RTP |
Utilities Standards Bodies Industry Groups Vendors & Suppliers |
Presented IntelliGrid Architecture concepts to
communication experts, with discussions on communication protocol
requirements and object modeling requirements |
Utilized as general
background information for multiple use cases. |
IEEE T&D Show Presentation and meetings by/with
Erich Gunther, Mark Adamiak, and Jeff Lamoree |
General Audience, multiple
individuals |
Multiple domains and
functions |
Utilities Standards Bodies Industry Groups Vendors & Suppliers |
Provided overview of IntelliGrid Architecture project.
Solicited input from audience. Engaged in general one-on-one
discussions with meeting attendees. |
Utilized as general
background information for multiple use cases. |
CEIDS DER/ADA Stakeholder
Meeting Participation by Frances
Cleveland, Nokhum Markushevich, and Erich Gunther |
DER/ADA Project team members |
Distributed Resources –
object modeling, device interactions |
Utilities Government Institutions Industry Groups Vendors & Suppliers |
Gathered detailed information
for DR device object models and communication requirements. Draft
document available as input |
Needs to be converted into a
use cases |
Electric Association of
Pennsylvania Regional Meeting Presentation by Mark Adamiak |
Various individuals |
Multiple domains and
functions |
Utilities Industry Groups Vendors & Suppliers End User Groups |
Provided overview of IntelliGrid Architecture
project. Solicited input from audience. |
Utilized as general
background information for multiple use cases. |
IEEE PSRC and UCA UG Presentation and in person
interviews by/with Erich Gunther, Mark Adamiak and
Frances Cleveland |
General Audience, multiple
individuals |
Multiple domains and
functions |
Utilities Government Institutions Industry Groups Vendors & Suppliers Standards Bodies |
Provided overview of IntelliGrid Architecture
project. Solicited input from audience. Engaged in general
one-on-one discussions with meeting attendees. |
Utilized as general
background information for multiple use cases. |
IEEE/Cigré
Meeting Presentation by Marek Samotyj |
General Audience |
CEIDS and IntelliGrid Architecture Vision |
Utilities Industry Groups Vendors & Suppliers International
Representatives |
Provided overview of IntelliGrid Architecture
project. Solicited input from audience. |
Respond to submitted
comments on Twiki and by e-mail. |
IEC TC57 Plenary, SPAG, and
WG meetings Oct. 13-16 |
Various individuals |
DER-ADA WAMAC Consumer/RTP |
Utilities Industry Groups Vendors & Suppliers International
Representatives Standards Bodies |
Frances Cleveland led a
review of IEC TC57 Reference Architecture, and the harmonization of IEC61850
object modeling with the CIM information modeling. Discussions of what an
architecture is or needs to include. IEC TC57 Reference Architecture was
changed to reflect more comprehensive and more object-oriented approaches,
including the concepts used by ebXML for metamodels of information. The IEC
TC57 experts are highly critical stakeholders for input to and review of the
IntelliGrid Architecture |
Individual and collective
follow-ups are progressing |
Presentation by Erich
Gunther |
General Audience |
IntelliGrid Architecture Overview |
Utilities |
Provided overview of IntelliGrid Architecture
project. Solicited input from audience. |
Respond to submitted
comments on Twiki and by e-mail. |
DOE Project Review Meeting –
In person interview with
Erich Gunther |
Ron Hofmann California Energy Commission |
Consumer – demand response |
Government Institutions |
Obtained list of demand response
functions, concerns, and priorities. Obtained documents from which to
derive use cases |
Needs to be converted into
use cases. |
DOE Project Review Meeting –
In person interview with
Erich Gunther |
Bob Yinger Southern California Edison |
Consumer - RTP |
Utilities |
Obtained general background
of SCE RTP activities. Identified SCE staff for follow up. |
Information processed into
RTP uses cases and published on SharePoint.
Follow up required to refine and add additional use cases. |
DOE Project Review Meeting –
In person interview with
Erich Gunther |
Mark Rawson California Energy Commission |
Consumer and Distributed
Resources |
Government Institutions |
Obtained list of distributed
resource functions important in California. Obtained documents from
which to derive use cases. |
Needs to be converted into
use cases |
|
Daniel Major Hydro Quebec |
WAMAC Contingency Analysis
Baseline |
Utilities |
Briefly explained IntelliGrid Architecture project, and obtained clarification of: · Off-line and on-line usage of Contingency Analysis · Process and data flow · Data from/to other systems · Users · Functionality · Set-up and initialization procedures · User documentation and tools |
Plan future meeting to · Explain IntelliGrid Architecture project and the value story to
management · Solicit participation in the project as an active
"stakeholder" · Validation of current usage, process and data flow,
communications methods, limitations · Discuss "wish list" for a more capable CA,
and future communications requirements |
Powersystems World In person interview with
Erich Gunther |
Jane Thornton IBM |
Consumer – power quality,
general |
Vendors & Suppliers End User Groups |
General interview.
Provided overview of IntelliGrid Architecture project. Laid groundwork for future contact
for possible use cases. |
Need to review documents
obtained from Jane, identify potential use cases, and follow up. |
Powersystems World In person interview with
Erich Gunther |
Bob Jones Federal Aviation
Administration |
Consumer – demand response,
power quality, asset management |
Government Institutions End User Groups |
Provided overview of IntelliGrid Architecture
project. Obtained input for power monitoring and power quality use
cases. |
Information fed into power
quality use case and published on SharePoint.
Will use information for other use cases not yet complete. |
Powersystems World In person interview with
Erich Gunther |
Ray Mohan Northrop Grumman |
Consumer – asset management |
End User Groups |
Identified requirements
necessary for management of UPS and stand-by generation plant. |
Needs to be converted into use
cases. |
Powersystems World In person interview with
Erich Gunther |
Richard Stetler Power Measurement |
Consumer – power metering,
power quality |
Vendors & Suppliers |
Provided overview of IntelliGrid Architecture project.
Obtained input for power monitoring and power quality use cases. |
Information fed into power
quality use case and published on SharePoint.
Will use information for other use cases not yet complete. |
Powersystems World In person interview with
Erich Gunther |
Jerry Olechiw Dranetz-BMI |
Consumer – power metering,
power quality, DR aggregation |
Vendors & Suppliers |
Provided overview of IntelliGrid Architecture
project. Obtained input for power monitoring and power quality use
cases. |
Information fed into power
quality use case and published on SharePoint.
Will use information for other use cases not yet complete. |
Powersystems World Paper presentation by Erich
Gunther |
Power Engineers, System
Integrators |
IntelliGrid Architecture Overview |
Utilities Vendors & Suppliers End Use Groups |
Provided overview of IntelliGrid Architecture
project. Solicited input from audience. |
Respond to submitted
comments on Twiki and by e-mail. |
Meeting on |
Dan Nordell Xcel Energy |
WAMAC ADA-DER |
Utilities |
Discussed concept of
“auto-sourcing” distribution feeder |
Need to follow up with
domain template |
Nov. 7 and |
Andrew Yuen and Jeff Penrice Hydro One Networks (“wires” portion
of Ontario Hydro) |
WAMAC Contingency Analysis
Baseline Contingency Analysis Future |
Utilities |
Provided overview of IntelliGrid Architecture
project and value story (sales pitch) Obtained "OK to
proceed" with minimal interruption, and limited access to a CA expert Received functional overview
and demonstration of the on-line use of CA for operations support Reviewed questions and
issues from the first meeting Clarified current CA on-line
usage with a more detailed demonstration and hands-on exposure Obtained screen copies for
better understanding of functionality and user interface |
Need to conduct future
meetings to: · Review the CA template and summarize the project
progress (i.e. show deliverables) · Solicit continued participation in the project as an
active "stakeholder" · Validate current usage, process and data flow,
communications methods, limitations · Discuss "wish list" for a more capable CA,
and future communications requirements |
GE Power Systems Conference
in Brazil, Nov. 10, presentation by Mark Adamiak |
Various individuals |
WAMAC |
Utilities End Use Groups International
Representatives |
Provided overview of IntelliGrid Architecture project.
Solicited input from audience. Engaged in general one-on-one
discussions with meeting attendees |
Utilized as general
background information for multiple use cases. |
Meeting
Nov. 12, with Mark Adamiak in Brazil |
George Kotlarewski Furnas |
WAMAC |
International
Representatives Utilities |
Discussion of IntelliGrid Architecture and
possible template on use of TCSC for inter-oscillation damping |
Need follow up engagement
via e-mail |
Meeting Nov. 12, with Mark Adamiak in Brazil |
Meeting with Rio Light |
WAMAC |
International
Representatives Utilities |
Discussed IntelliGrid Architecture
identification of “legacy” interface issue |
Need follow up engagement
via e-mail |
In person interview with
Erich Gunther |
Joe Kerecman PJM Interconnection |
Transmission operations –
general interview |
RTOs/ISOs |
Provided overview of
IntelliGrid Architecture. Discussed broad requirements for IntelliGrid Architecture. Invited to meet
with PJM in 2004 for full engagement. |
Schedule meeting with PJM |
In person interview with
Erich Gunther |
Steve Batsell ORNL |
Federated Services - Network
security |
Government Institutions |
Provided overview of
IntelliGrid Architecture. Discussed broad security requirements for IntelliGrid Architecture. |
Needs to be converted into a
use case. Schedule in person follow-up meeting. |
|
Members of WG |
Distributed Resources –
general communications requirements, object models, security |
Standards Bodies Utilities |
Gathered detailed
information for DR device object models and communication requirements.
Draft document available as input. |
Needs to be converted into a
use cases. |
IEC TC 88 PT 25 Meeting In person interview with
Erich Gunther |
Sandy Butterfield NREL – Wind Program And other wind industry
experts |
Transmission Connected
Generation – wind power plant communications |
Government Institution Vendors & Suppliers Utilities International Representative Standards Bodies |
Provided overview of
IntelliGrid Architecture. Obtained requirements for wind turbine and wind power plant
communications. Obtained document from which to derive use cases. |
Needs to be converted into a
use case. |
|
Members of IEC TC 57 WG 10
PQTF |
Consumer – power quality
metering object models and requirements |
Government Institution Vendors & Suppliers Utilities International Representative Standards Bodies |
Gathered detailed information
for PQ monitor object models and communication requirements. Draft
document available as input. |
Needs to be converted into a
use case. |
Meeting Dec. 8, with Peter
Sanza |
Engagement with Northeast
Utilities |
WAMAC |
Utilities |
Made presentation on IntelliGrid Architecture,
identified areas for further collaboration |
Need to follow up with
domain template or more specialized discussion with identified individuals |
Meeting December 9 and 11
with Mark Adamiak |
Bruce Fardarnash New York Power Authority |
WAMAC |
Utilities |
Meeting and discussion
resulting in definition of Voltage Control Cone |
Need to follow up with
domain template or more specialized discussion |
Phone interview Dec. 15 with
Jack King |
Donna Pratt Neenan Associates |
Consumer - RTP |
Vendors & Suppliers Market Participants |
Obtained requirements and
insight into RTP process. Determined that RTP industry is concentrating
on demand response issues. |
Information processed into
RTP use cases and published on SharePoint.
Follow up required to refine and add additional use cases. |
Powersystems World 2003/meeting at BGE on In person interview with
Erich Gunther and Marty Burns |
Vladimir Basch Baltimore Gas & Electric |
Distribution Operations – capacitor
bank control, outage management Federated services – network management. |
Utilities |
Provided overview of IntelliGrid Architecture
project. Obtained input for several use cases. |
Needs to be converted into
use cases. |
IEEE PSRC Tampa |
Various individuals |
Various domains and
functions |
Vendors & Suppliers Standards Bodies |
Erich Gunther and Mark Adamiak presented on IntelliGrid Architecture and conduct stakeholder
engagements |
Engagement completed |
UCA International Users
Group Tampa |
Various individuals |
Various domains and
functions |
Utilities Vendors & Suppliers Standards Bodies |
UCA UG meeting – IntelliGrid Architecture
presentation & stakeholder engagement by Mark Adamiak,
Frances Cleveland, and Erich Gunther |
Engagement completed |
Areva (Alstom) In person meeting with Mark Adamiak |
Alex Apostolov |
WAMAC |
Vendors & Suppliers |
Discussed optimal load shed |
Mark to follow up |
Distributech, Orlando |
Various Utility, vendor and
industry |
Various domains and
functions |
Utilities Vendors & Suppliers Government Institutions Industry Groups |
Erich Gunther spoke at
conference and helped teach Utility University. John Gillerman
helped teach Utility University. Sandy Smith, Mark Adamiak,
and others attended. Opportunities for stakeholder engagement and outreach to
industry press. |
Engagement completed |
Distributech Jan. 20-22, 2004 Orlando |
Larry Mansueti US Department of Energy Office of Electric
Transmission & Distribution |
Consumer-RTP Demand Response, Consumer
Load Control, Real Time Pricing |
Government Institution |
Sandy followed up with an
e-mail about obtaining more information on GridWise
(which Larry Mansueti is coordinating) as well as
an IEA project on DR |
|
Distributech Jan. 20-22, 2004 Orlando |
Brian White Gulf Power |
Consumer-RTP Demand Response, Consumer
Load Control |
Utility |
Sandy Smith spoke with him
after a presentation on Gulf Power’s DR program. Sandy briefly described
IntelliGrid Architecture and requested more info on comm. requirements. |
Sandy followed up with an
eye towards developing a DR use case |
Distributech Jan. 20-22, 2004 Orlando |
Ed Malemezian Consultant previously with
Florida Power & Light |
Consumer-RTP Demand Response, Consumer
Load Control, Real Time Pricing |
Utility |
Sandy Smith spoke with him
after a presentation on FP&L’s real-time DR
program. Sandy briefly described IntelliGrid Architecture and requested more info on comm.
requirements. |
Sandy followed up with an
interview to develop a use case on DR and load control |
Distributech Jan. 20-22, 2004 Orlando |
Robert Burke New England ISO |
Consumer-RTP Demand Response, Consumer
Load Control, Real Time Pricing |
RTOs/ISOs |
Sandy Smith spoke with him
during a conference session. Sandy briefly described IntelliGrid Architecture |
Sandy tried to follow up
with an eye towards getting information on communications requirements for
demand response |
Distributech Jan. 21 2004 Orlando |
Dick Preston Comverge |
Consumer-RTP Demand Response, Consumer
Load Control |
Vendor & Supplier |
Sandy Smith spoke with him
during a conference session. Sandy briefly described IntelliGrid Architecture |
Sandy tried to follow up
with an eye towards getting information on communications requirements for
demand response |
Distributech Jan. 20-22, 2004 Orlando |
Ross Malme RETX |
Consumer –RTP Demand Response, Consumer
Load Control |
Vendor & Supplier |
Sandy Smith spoke with him
during a conference session. Sandy briefly described IntelliGrid Architecture |
Sandy followed up with an
e-mail about obtaining more information on an IEA project on DR |
IEEE PES PSCC Meeting Orlando |
Individuals from TVA,
Arizona Public Service, University UK |
Security DER-ADA |
Standards Bodies Utilities |
Frances Cleveland working with
them on commencement of P1649 Technical Report on Security Assessments for
Utilities |
Initial contact, but
interest in project indicated |
IEEE Power Quality
Subcommittee Orlando |
Various individuals |
Consumer-RTP power quality metering
object models and requirements |
Utilities Vendors & Suppliers Standards Bodies |
IEEE PQ related task forces
and working groups meet. Erich Gunther made an IntelliGrid Architecture presentation and
undertook stakeholder engagements. |
Some contacts made and
follow ups planned |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
John Allemong,
American Electric Power |
WAMAC |
Utilities |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Navin Bhatt, American Electric Power |
WAMAC |
Utilities |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Dan Boezio American Electric Power |
WAMAC |
Utilities |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Paul Barber CERTS |
WAMAC |
Government Institutions |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Vikram Budhraja CERTS |
WAMAC |
Government Institutions |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Matt Donnelly CERTS |
WAMAC |
Government Institutions |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Jim Dyer CERTS |
WAMAC |
Government Institutions |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern Interconnect
Phasor Project Washington, DC |
Ross Guttromson CERTS |
WAMAC |
Government Institutions |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Sakis Meliopoulos CERTS |
WAMAC |
Government Institutions |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Phil Overhold CERTS |
WAMAC |
Government Institutions |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Floyd Galvan Entergy |
WAMAC |
Utilities |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Don Minnis FPL |
WAMAC |
Utilities |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern Interconnect
Phasor Project Washington, DC |
Bogdan Kasztenny GE |
WAMAC |
Vendors & Suppliers |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
William Premerlani GE |
WAMAC |
Vendors & Suppliers |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Eric Huffine Midwest ISO |
WAMAC |
RTOs/ISOs |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Dale Osborn Midwest ISO |
WAMAC |
RTOs/ISOs |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Bill Phillips Midwest ISO |
WAMAC |
RTOs/ISOs |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern Interconnect
Phasor Project Washington, DC |
Bob Cummings NERC |
WAMAC |
Regulator Industry Groups |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Brian Nolan NERC |
WAMAC |
Regulator Industry Groups |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Tom Vandervort NERC |
WAMAC |
Regulator Industry Groups |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Joe Chow New York ISO |
WAMAC |
RTOs/ISOs |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Jon Ponder PJM |
WAMAC |
RTOs/ISOs |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern Interconnect
Phasor Project Washington, DC |
George Alexander Schweitzer Engineering
Laboratories |
WAMAC |
Vendors & Suppliers |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern Interconnect
Phasor Project Washington, DC |
Susan Fagan Schweitzer Engineering
Laboratories |
WAMAC |
Vendors & Suppliers |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Armando Guzman Schweitzer Engineering
Laboratories |
WAMAC |
Vendors & Suppliers |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
David Marshall Southern Company |
WAMAC |
Utilities |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
James Viikinsalo Southern Company |
WAMAC |
Utilities |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Mike Ingram TVA |
WAMAC |
Utilities |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Meeting on Eastern
Interconnect Phasor Project Washington, DC |
Wai-Ran TVA |
WAMAC |
Utilities |
Mark Adamiak
and Peter Sanza presented on IntelliGrid Architecture |
Need to follow up |
Group Engagement with BPA Vancouver, WA |
Ken Martin Carson Taylor Mike Hoffman Jim Tillet |
WAMAC Consumer/RTP |
Utilities |
Mark Adamiak
coordinated Discussed power business, demand response, direct load control,
customer response. |
Needs to be converted into
use cases. |
Group Engagement with
Pacific Northwest National Laboratory Richmond, WA |
Researchers |
WAMAC |
Government Institutions |
Mark Adamiak
coordinated. Discussed direct load control |
Needs to be converted into
use cases. |
Group Engagement with
PG&E San Francisco and Oakland,
CA |
Utility Engineers |
WAMAC DER-ADA Consumer/RTP |
Utilities |
Mark Adamiak
coordinated. Discussed communication requirements for the three cone areas |
Needs to be converted into
use cases. |
Group Engagement with Electricite de France Near Paris |
Andre Maizener Eric Lanbert |
WAMAC Consumer/RTP |
Utilities |
John Gillerman
discussed transmission-related E Commerce |
Input will be used to refine
existing use cases and help with the formulation of new ones |
Group Engagement with Electricite de France Near Paris |
Andre Maizener Eric Lambert Jean-Claude Gauthier Xavier Mamo Sylvie Mallet Olivier Huet Arnaud Valenti Michael Boll Frederic Gorgette Floriane Fesquet Pascale Michalak Juliette LeDelliou Anne Picault Aline Pajot Henry Boccon-Gibod Joseph Maire |
WAMAC DER-ADA Consumer/RPT |
Utilities |
Engagement with Erich Gunther,
Mark Adamiak, Frances Cleveland, Walt Dixon, Marty
Burns, and others. Presented findings so far and discussed
communication requirements for the three cone areas. |
Input will be used to refine
existing use cases and serve as foundation for new ones. |
Group Engagement with Polish
Power Grid Warsaw |
Utility Engineers |
WAMAC DER-ADA Consumer/RPT |
Utilities |
Engagement with Erich
Gunther, Mark Adamiak, Frances Cleveland, Walt
Dixon, and others. Presented findings so far and discussed
communication requirements for the three cone areas. |
Input will be used to refine
existing use cases and serve as foundation for new ones. |
Meeting |
Charlie Smith Nexgen Energy |
Consumer/RTP |
Vendors & Suppliers Market Participants |
Obtained requirements and
insight into aggregation of DG to participate in DR programs and open energy
markets. |
Information processed into
use case and published on SharePoint. |
Clemson Power Systems
Conference Clemson, SC |
Utility Engineers Academics Industry Representatives |
DER-ADA Consumer/RTP |
Utilities Government Institutions |
Erich Gunther and Mark Adamiak spoke and held individual engagements |
Engagement completed, some
follow up required. |
Frances Cleveland meetings
with LIPA |
George Ello |
DER |
Utilities |
Ongoing phone and e-mail
exchanges on DER issues. |
Ongoing. |
We Energies Milwaukee, WI |
Graham Siegel Other Utility Engineers |
WAMAC Distribution Consumer |
Utilities Vendors Customers |
Frances Cleveland conducted
three day stakeholder workshop |
Engagement completed, input
will be used to refine existing use cases and serve as foundation for new
ones. |
NERC Data Exchange Working Group Meeting New Orleans |
Regulatory and Industry
Group Engineers Industry Representatives |
WAMAC |
Regulators Industry Groups |
Herb Falk spoke on ICCP
security |
Engagement completed. |
Workshop between Fast
Simulation and Modeling and IntelliGrid Project Participants Palo Alto, CA |
GE (IntelliGrid Architecture prime contractor) ABB (FSM Prime Contractor) EPRI and E2I personnel |
WAMAC Distribution Consumer |
Vendors Suppliers |
Meeting to present overview
of the two CEIDS projects, review status, present IntelliGrid Architecture tools and
methodologies and brainstorm ideas for integrating the two project efforts
going forward. |
Engagement completed, some
follow up required. |
Australian Power Grid Sydney, Australia |
Utility Engineers |
Architectural Issues –
61850, CIM, Security, Network Management |
Utilities |
Frances Cleveland conducted
3 day stakeholder engagement through Ray Lings of EPRI |
Engagement completed, some follow
up required. |
EPRI PQA Garden City, NY |
Utility Engineers Vendors & Supplier
personnel |
Consumer/RTP DER |
Utilities Vendors & Suppliers |
Erich Gunther delivered a
keynote address on IntelliGrid Architecture and held individual engagements |
Engagement completed |
IEEE/PES Broadband over
Power Lines Standards Interest Meeting Denver, CO |
Various Personnel |
Various domains and
functions |
Utilities Vendors & Suppliers Standards Bodies |
Erich Gunther presented on IntelliGrid Architecture
and held a discussion on how standards for broadband over power lines could
play a role in an integrated energy and communications system architecture |
Engagement completed |
ATM Forum, "Customer Network Management (CNM) for ATM Public Network Service," ATMF Specification af-nm-0019.000, October 1994.
ATM Forum, "Integrated Local Mgmt. Interface (ILMI) Ver. 4.0," ATMF Specification af-ilmi-0065.000, September 1996.
ATM Forum, "ATM Remote Monitoring SNMP MIB," ATMF Specification af-nm-test-0080.000, July 1997.
ATM Forum, "SNMP M4 Network Element View MIB," ATMF Specification af-nm-0095.001, July 1998.
ATM Forum, "Network Management M4 Security Requirements and Logical MIB," ATMF Specification af-nm-0103.000, January 1999.
ATM Forum, "M4 Interface Requirements and Logical MIB: ATM Network View Version 2," ATMF Specification af-nm-0058.001, May 1999.
ATM Forum, "Auto-configuration of PVCs Specification," ATMF Specification af-nm-0122.000, May 1999.
ATM Forum, "CMIP Specification for the M4 Interface: ATM Network Element View, Version 2," ATMF Specification af-nm-0027.001, July 1999.
ATM Forum, "ATM Usage Measurement Requirements," ATMF Specification af-nm-0154.000, November 2000.
ATM Forum, "Requirements and Logical MIB for Management of Path and Connection Trace,” ATMF Specification, af-nm-0153.000, April, 2001.
ATM Forum, “CORBA Specification for M4 Interface: Network View,” ATMF Letter Ballot Document: fb-nm-0166.000, April 2001.
ATM Forum, "M4 Interface: ATM Network View, CORBA MIB, Version 2," ATMF Specification af-nm-0185.000, August 2002.
ATM Forum, "ATM Performance Management Bulk, Data File Structure," ATMF Specification af-nm-0194.000, April 2003.
Bellcore TA-NWT-001114, Generic Requirements for Operations Interfaces Using OSI Tools: ATM/Broadband Network Management, Issue 2, October 1993.
GR-2869-CORE, Generic Requirements for Operations Based on the Telecommunications Management Network (TMN) Architecture, Issue 2, Bellcore, October 1996.
SR-TSV-002690, Requirements for an EML Platform Environment, Bellcore, Issue 1, March 1994.
Network Management Layer to Element Manager Interface Description, Bellcore, February 1996.
Bellavista P., Corradi A., Stefanelli C., "An Integrated Management Environment for Network Resources and Services," IEEE Journal on Selected Areas in Communications, Vol. 18, No. 5, May 2000.
Casassa M., Baldwin A., Goh C., "POWER Prototype: Towards Integrated Policy-Based Management," IEEE/IFIP Network Operations and Management Symposium, 2000.
Cheikhrouhou M. M., Conti P., Labetoulle J., "Intelligent Agents in Network Management: A State-of-the-art," 1998.
Dobson J.E., McDermid J.A.,"A Framework for Expressing Models of Security Policy," IEEE Symposium on Security & Privacy, May 1989, Oakland, CA, 1989.
Data-Over-Cable Service Interface Specifications DOCSIS 2.0 - Operations Support System Interface Specification, SP-OSSIv2.0-104-030730, July 2003.
DSL Forum “ADSL Network Element Management,” DSL Forum Technical Report TR-005, March 1998.
DSL Forum, “The Operation of ADSL-based Networks,” DSL Forum Technical Report TR-022, August 1999.
DSL Forum, "ADSL EMS to NMS Functional Requirements," DSL Forum Technical Report TR-030, Feb 2000.
DSL Forum, “Protocol Independent Object Model for ADSL EMS-NMS Interface,” DSL Forum Technical Report: TR-035, March 2000.
DSL Forum, “CORBA Specification for ADSL EMS-NMS Interface,” DSLF Technical Report TR-041, June 2001.
DSL Forum, “Auto-Configuration Architecture & Framework,” DSL Forum Technical Report, TR-046, February 2002.
R. Enns, "XMLCONF Cofiguration Protocol," IETF Internet Draft draft-enns-xmlconf-spec-00.txt, February 2003.
D. Ginsburg, ATM Solutions for Enterprise Internetworking, 2nd Edition, Addison Wesley, 1999.
D. Ginsbury, Implementing ADSL, Addison Wesley, 1999.
Goldszmidt G., Yemini Y., "Distributed Management by Delegation," Proceedings of the 15th International Conference on Distributed Computing Systems, June 1995.
Hegering H., Abeck S., Neumair B., Integrated Management of Network Systems, Morgan Kaufmann Publishers, Inc. 1999.
“Network Data Management
– Usage (NDM-U) For IP-Based Services,” Version 3.1, IPDR.org,
ITU-T Draft Recommendation G.997.1, "Physical Layer Management for Digital Subscriber Line (DSL) Transceivers," October 1998.
ITU-T Recommendation M.3010: “Principles for a Telecommunications Management Network,” October 1992.
ITU-T Recommendation M.3100: “Generic Network Information Model Version 2,” March 1995.
ITU-T, SG4, Recommendation M.3120, “CORBA Generic Network and NE Level Information Model," October 2001.
ITU-T, SG4, Recommendation Q.822.1, “CORBA-based TMN Performance Management Service,” October 2001.
ITU-T Recommendation X.720, "Information Technology – Open Systems Interconnection – Structure of Management Information: Management Information Model," January 1992.
ITU-T Recommendation X.721, “Information Technology - Open Systems Interconnection - Structure of Management Information - Part 2: Definition of Management Information,” February 1992.
Ju H., Choi M., Hong J., "EWS-Based Management Application Interface and Integration Mechanisms for Web-Based Element Management," Journal of Network and Systems Management, Vol.9, No.1, 2001.
Knight G., Hazemi R., "Mobile Agent-Based Management in the INSERT Project," Journal on Network and Systems Management, Vol.7, 1999.
Koch F. L., Westphall C. B., "Decentralized Network Management Using Distributed Artificial Intelligence," Journal of Network and Systems Management, Vol.9, No.4, Dec. 2001.
Lange, D., "Java Aglets Application Programming Interface (J-AAPI)," IBM white paper, Feb. 1997. (www.trl.ibm.com/aglets/JAAPI-whitepaper.htm).
Lupu E., Sloman M., "Conflicts in Policy-Based Distributed Systems Management," IEEE Transactions on Software Engineering, Vol. 25, No. 6, Nov. 1999.
Subramanian, Mani, Network Management, Principles and Practice, Addison Wesley, 2000.
Martin-Flatin J., "Push vs. Pull in Web-Based Network Management,"Technical Report SSC/1998/002, Swiss Federal Institute of Technology Lausanne, 1998.
Martin-Flatin J. P., Znaty S., Hubaux J. P., "A Survey of Distributed Enterprise Network and Systems Management Paradigms," Journal of Network and Systems Management, Vol.7, No.1, 1999.
Moffett J., Sloman M., Policy Hierarchies for Distributed Systems Management, IEEE Journal on Selected Areas in Communication, Vol. 11, No. 9, December 1993.
T. D. Nadeau, MPLS Network Management - MIBs, Tools and Techniques, Morgan Kaufmann, 2003.
The Object Management Group (OMG), “The Common Object Request Broker: Architecture and Specification,” OMG Document: formal/99-10-07, Revision 2.3.1, October 1999.
Prozeller P., "TINA and the Software Infrastructure of the Telecom Network of the Future," Journal on Network and System Management, Vol.5, December 1997.
Raouf Boutaba, Jin Xiao, "Network Management: State of the Art," Communication Systems: The State of the Art (IFIP World Computer Congress), p.g.127-146, 2002.
K. McCloghrie, M. Rose, “Structure and Identification of Management Information for TCP/IP-based Internets,” IETF RFC 1155, May 1990.
Schoffstall, M., Fedor, M., Davin, J. and Case, J., A Simple Network Management Protocol (SNMP), IETF RFC 1157, May, 1990.
K. McCloghrie, M. Rose, “Concise MIB Definitions,” IETF RFC 1212, March 1991.
K. McCloghrie and M. Rose. Management Information Base for Network Management of TCP/IP-base Internets: MIB-II, IETF RFC 1213, March 1991
Rose, M.T. “A Convention for Defining Traps for use with the SNMP,” IETF RFC 1215, March 1991.
L. Steinberg. Techniques for Managing Asynchronously Generated Alerts, IETF RFC 1224, May 1991.
F. Baker, J. Watt, “Definitions of Managed Objects for the DS1 and E1 Interface Types,” IETF RFC 1406, January 1993.
T. Cox, K. Tesink, “Definitions of Managed Objects for the DS3/E3 Interface Type,” IETF RFC 1407, January 1993.
J. Case, K. McCloghrie, M. Rose, S. Waldbusser, “Introduction to version 2 of the Internet-standard Network Management Framework,” IETF RFC 1441, May 1993.
J. Case, K. McCloghrie, M. Rose, S. Waldbusser, “Structure of Management Information for version 2 of the Simple Network Management Protocol (SNMPv2),” IETF RFC 1442, May 1993.
J. Case, K. McCloghrie, M. Rose, S. Waldbusser, “Textual Conventions for version 2 of the Simple Network Management Protocol (SNMPv2),” IETF RFC 1443, May 1993.
J. Case, K. McCloghrie, M. Rose, S. Waldbusser, “Conformance Statements for version 2 of the Simple Network Management Protocol (SNMPv2),” IETF RFC 1444, May 1993.
J. Davin, K. McCloghrie, “Administrative Model for version 2 of the Simple Network Management Protocol (SNMPv2),” IETF RFC 1445, May 1993.
J. Galvin, K. McCloghrie, “Security Protocols for version 2 of the Simple Network Management Protocol (SNMPv2),” IETF RFC 1446, May 1993.
K. McCloghrie, J. Galvin, “Party MIB for version 2 of the Simple Network Management Protocol (SNMPv2),” IETF RFC 1447, May 1993.
J. Case, K. McCloghrie, M. Rose, S. Waldbusser, “Protocol Operations for version 2 of the Simple Network Management Protocol (SNMPv2),” IETF RFC 1448, May 1993.
J. Case, K. McCloghrie, M. Rose, S. Waldbusser, “Transport Mappings for version 2 of the Simple Network Management Protocol (SNMPv2),” IETF RFC 1449, May 1993.
J. Case, K. McCloghrie, M. Rose, S. Waldbusser, “Management Information Base for version 2 of the Simple Network Management Protocol (SNMPv2),” IETF RFC 1450, May 1993.
J. Case, K. McCloghrie, M. Rose, S. Waldbusser, “Manager to Manager Management Information Base,” IETF RFC 1451, May 1993.
J. Case, K. McCloghrie, M. Rose, S. Waldbusser, “Coexistence between version 1 and version 2 of the Internet-standard Network Management Framework,” IETF RFC 1452, May 1993.
E. Decker, P. Langille, A. Rijsinghani, and K.McCloghrie., Definitions of Managed Objects for Bridges, IETF RFC 1493, July 1993.
K. McCloghrie, F. Kastenholz, “Evolution of the Interfaces Group of MIB-II,” IETF RFC 1573, January 1994.
T. Brown, K. Tesink, “Definitions of Managed Objects for the SONET/SDH Interface Type,” IETF RFC 1595, March 1994.
M. Ahmed and K. Tesink, “Definitions of Managed Objects for ATM Management, Version 8.0 using SMIv2,” IETF RFC 1695, August 1994.
Waldbusser S., Remote Network Monitoring Management Information Base., IETF RFC 1757, February 1995.
Case, J., McCloghrie, K., Rose, M. and S. Waldbusser, “Introduction to Community-based SNMPv2,” IETF RFC 1901, January 1996.
Case, J., McCloghrie, K., Rose, M., and S. Waldbusser, “Textual Conventions for Version 2 of the Simple Network Management Protocol (SNMPv2),” IETF RFC 1903, January 1996.
Case, J., McCloghrie, K., Rose, M. and S. Waldbusser, “Protocol Operations for Version 2 of the Simple Network Management Protocol (SNMPv2),” IETF RFC 1905, January 1996.
Case, J., McCloghrie, K., Rose, M. and S. Waldbusser, “Transport Mappings for Version 2 of the Simple Network Management Protocol (SNMPv2),” IETF RFC 1906, January 1996.
Case, J., McCloghrie, K., Rose, M. and S. Waldbusser, “Management Information Base for Version 2 of the Simple Network Management Protocol (SNMPv2),” IETF RFC 1907, January 1996.
K. McCloghrie, “Category: Standards Track SNMPv2 Management Information Base for the Internet Protocol using SMIv2,” IETF RFC 2011, November 1996.
K. McCloghrie, “Category: Standards Track SNMPv2 Management Information Base for the User Datagram Protocol using SMIv2,” IETF RFC 2013, November 1996.
J. Case, R. Mundy, D. Partain, B. Stewart, “Introduction to Version 3 of the Internet-standard Network Management Framework,” IETF RFC 2570, April 1999.
Harrington, D., Presuhn, R. and B. Wijnen, “An Architecture for Describing SNMP Management Frameworks,” IETF RFC 2571, April 1999.
Case, J., Harrington, D., Presuhn, R. and B. Wijnen, “Message Processing and Dispatching for the Simple Network Management Protocol (SNMP),” IETF RFC 2572, April 1999
Levi, D., Meyer, P. and B. Stewart, “SNMP Applications,” IETF RFC 2573, April 1999.
Blumenthal, U. and B. Wijnen, “The User-Based Security Model for Version 3 of the Simple Network Management Protocol (SNMPv3),” IETF RFC 2574, April 1999.
Wijnen, B., Presuhn, R. and K. McCloghrie, “View-based Access Control Model for the Simple Network Management Protocol (SNMP),” IETF RFC 2575, April 1999.
R. Frye, D. Levi, S. Routhier, B. Wijnen, “Coexistence between Version 1, Version 2, and Version 3 of the Internet-Standard and Network Management Framework,” IETF RFC 2576, March 2000.
McCloghrie, K., Perkins, D., Schoenwaelder, J., Case, J., Rose, M. and S. Waldbusser, “Structure of Management Information Version 2 (SMIv2),” IETF RFC 2578, April 1999.
McCloghrie, K., Perkins, D., Schoenwaelder, J., Case, J., Rose, M. and S. Waldbusser, “Textual Conventions for SMIv2,” IETF RFC 2579, April 1999.
McCloghrie, K., Perkins, D., Schoenwaelder, J., Case, J., Rose, M. and S. Waldbusser, “Conformance Statements for SMIv2,” IETF RFC 2580, April 1999.
B. Bathrick, F. Ly, "Definitions of Managed Objects for the ADSL Lines,” IETF RFC 2662, August 1999.
J. Flick, J. Johnson, “Definitions of Managed Objects for the Ethernet-like Interface Types,” August 1999.
M. St. Johns, “DOCSIS Cable Device MIB Cable Device Management Information Base for DOCSIS compliant Cable Modems and Cable Modem Termination Systems,” August 1999.
M. St. Johns, “Radio Frequency (RF) Interface Management Information Base for MCNS DOCSIS compliant RF interfaces,” August 1999.
D. Durham, Ed. "The COPS (Common Open Policy Service) Protocol," IETF RFC 2748, January 2000.
M. St. Johns, “Diffie-Helman USM Key Management Information Base and Textual Convention,” IETF RFC 2786, August 1999.
K. McCloghrie, F. Kastenholz, “The Interfaces Group MIB,” June 2000.
McCloghrie, K., Farinacci, D., Thaler, D., “Internet Group Management Protocol MIB,” IETF RFC 2933
R. Woundy, “Baseline Privacy Interface Management Information Base for DOCSIS Compliant Cable Modems and Cable Modem Termination Systems,” RFC 3083, March 2001.
Chan K, et al, "COPS Usage for Policy Provisioning," IETF RFC 3084, March 2001.
D. Rawlins et al, "Framework for Policy Usage Feedback for Common Open Policy Service with Policy Provisioning (COPS-PR)," March 2003.
Rogerson D., Inside COM, Redmond, WA, Microsoft, 1997
Straber M., Baumann J., Fohl F., "Mole – A Java Based Mobile Agent System," 10th European Conference on Object-Oriented Programming ECOOP’96. July 1996.
Thompson J., "Web-based Enterprise Management Architecture," IEEE Communications Magazine, March 1998.
Wooldridge M., Jennings N. R., "Intelligent Agents: Theory and Practice, The Knowledge Engineering Review," Vol. 10, No.2, 1995.
“Experience of System - Wide Distribution Automation At JEA,” Don C. Gilbert, Nokhum Markushevich and Alex Fratkin, DistribuTECH 2004 Conference.
“Distribution Volt And Var Control In Emerging Business Environment,” Nokhum Markushevich (UCI) and Ron Nielsen (B.C. Hydro), CEA Technologies Distribution Automation Seminar, Halifax, Nova Scotia, Canada. June 2003.
“Strategic Operations of Distribution Systems in the
Future,” Nokhum Markushevich, Frances Cleveland, The DER/Advanced Distribution
Automation System Project Stakeholder Team Formation Workshop,
“The Specifics Of Coordinated Real-Time Voltage And Var Control In Distribution,” Nokhum S. Markushevich, Utility Consulting International (UCI), DistribuTECH 2002 Conference.
“Capacitor Control In Distribution Automation At OG&E,” Aleksandr P. Berman, Nokhum S. Markushevich (UCI), and James C. Clemmer (OG&E), DistribuTECH 2001 Conference.
“Performance Of Advanced DA Applications Implemented in JEA,” Nokhum S. Markushevich (UCI), Charles J. Jensen (JEA), Alex I. Fratkin (UCI), and Jerry Knowles (JEA), DistribuTECH 2001 Conference.
“Adaptive Control Of Multiple Protective Devices In The Distribution Automation System At JEA,” Charles J. Jensen (JEA), Nokhum S. Markushevich and Aleksandr P. Berman (UCI), DistribuTECH 2001 Conference.
“Implementation Of Advanced Distribution Automation In US Utilities,” Nokhum S. Markushevich and Aleksandr P. Berman (Utility Consulting International), Charles J. Jensen (JEA), James C. Clemmer (OG&E), USA, CIRED Conference, Amsterdam, 2001.
“Advanced Network Applications In The Distribution Management System At City Public Service Of San Antonio,” G. Hitzfelder (CPS), I. Roytelman, B. Nikolic, R. Horn (Siemens PT & D), N. Markushevich (UCI), DistribuTECH 2001 Conference,
“Implementation Of Advanced Distribution Automation At JEA And OG&E,” Charles J. Jensen (JEA), James C. Clemmer (OG&E), Nokhum S. Markushevich (UCI), DA/DSM DistribuTECH Conference, January 2000, Miami, Florida.
“Distribution Automation Pilot Projects At JEA And OG&E,” New Ideas For Remote Voltage And Var Control, Charles J. Jensen, James C. Clemmer Nokhum S. Markushevich, DA/DSM DistribuTECH Conference, January 1999.
“Distribution Automation Project For The Peninsular Malaysian Distribution System,” E. Chan, M Delson, N, Markushevich, K. Walston, Ir. T.A. Zaharuddin, and Jamal A. Nasir, CEPSI Conference, 1998.
“Dynamic System Load Control through Use of Optimal Voltage and Var Control,” Nokhum Markushevich, Ron E. Nelson, 1998 Dynamic Modeling Control Applications for Industry Workshop, IEEE Industry Application Society, 1998, Vancouver, Canada.
“Optimizing Feeder Sectionalizing Points for Distribution Automation,” Charles Jensen, Nokhum Markushevich, Alex Berman, DA/DSM DistribuTECH Conference, January 1998, Tampa, Florida.
“Analysis of Capacitor Control Under Conditions of Distribution Automation at OG&E,” Nokhum Markushevich, James Clemmer, Alex Berman, Alla Royz, DA/DSM DistribuTECH Conference, January 1998, Tampa, Florida.
“The Impact of Simplification of the Distribution System Model on the Benefits of Voltage and Var Control,” Nokhum Markushevich, Alex Berman, Dan Nordell, Craig Halverson; DA/DSM DistribuTECH Conference, January 1997, San Diego, California.
“Justification and Planning of Distribution Automation,” Edward H.P. Chan, Nokhum S. Markushevich; CEPSI Conference, September 1996, Malaysia.
“Impact Of Automated Voltage/Var Control In Distribution On Power System Operations,” Nokhum S. Markushevich, R.E. Nielsen, A.K. Nakamura, J.M. Hall, R.L. Nuelk; DA/DSM Conference January 1996, Tampa, Florida.
“Update on DA Pilot Project at B.C. Hydro,” Nokhum S. Markushevich Ron E. Nielsen, Fifth DA/DSM Conference January 1995, San Jose, California.
“Load to Voltage Dependency Tests at B.C. Hydro,” Alf Dwyer, Ron Nielsen, Joerg Stangl, Nokhum S. Markushevich; IEEE/PES 1994 Summer Meeting, July 1994.
“Modeling Distribution Automation,” Nokhum S. Markushevich; DA/DSM Conference, January 1994, Florida.
“Planning a Distribution Automation Pilot Project at B.C. Hydro,” Nokhum S. Markushevich, Martin Delson, Erik Benedictson, Alf Dwyer, Ivan Herejk, Carl Kober, Ron Nielsen, Joerg Stangl; DA/DSM Conference, January 1994, Florida.
“Integration Of Distribution Automation into Power System Operation,” Edward H.P. Chan, Nokhum S. Markushevich; DA/DSM Conference, January 1994, Florida.
“Cost-Benefit Study for Distribution Automation at B.C. Hydro,” Nokhum S. Markushevich, Ivan C. Herejk, Ron E. Nielsen, Utility Consulting International, USA,, Distribution 2000 Conference, November 1993, Australia.
“Functional Requirements and Cost-Benefit Study for Distribution Automation at B.C. Hydro,” Nokhum S. Markushevich, I.C. Herejk, Ron Nielsen, 1993 IEEE.
“Voltage and VAR Control in Automated Distribution Systems,” Nokhum S. Markushevich; DA/DSM Conference, January 1993, Palm Springs, California.
“Real Time Optimization of Power System Steady State Operating Conditions for Voltage and Reactive Power,” N.B. Vladimirova, V.Costyushko, N.S. Markushevich, V.A. Timofeyev, N.P. Yemelyanov (USSR); CIGRE, September 1990.
“Method of Capacitor Automatic Control,” Nokhum S. Markushevich, Certificate of Invention, USSR # 1275409, 1986.
“Device for Automatic Voltage Control in Electric Networks,” V.I. Zak, Nokhum S. Markushevich, Certificate of Invention, USSR # 1288816, 1985.
“Voltage Control and Electric Energy Conservation,” Nokhum S. Markushevich, Moscow: Energoatomizdat, 1984, pp.1‑100. Sofia: Technika, 1987, pp. 1‑84.
“Automated Control of 6‑20 kV Electric Network Operations,” Nokhum S. Markushevich. Moscow: Energiya, 1980, pp. 1‑208.
“Device for Reactive Power Source Control,” Nokhum S. Markushevich, Certificate of Invention USSR. # 922703, 1981.
“Enhancement of the Authenticity of the Electric Network Power Flow Calculation,” Nokhum S. Markushevich, Electrichestvo, # 12, 1979, pp. 1‑5.
“Voltage Quality in Urban Electric Networks,” Nokhum S. Markushevich, L.A. Soldatkina. Moscow: Energiya, 1975, pp. 1‑256.
“Automatic Frequency Load Shedding in USSR Power Systems,” G.Boutin, N. Markushevich, M. Portnoy, at al. CIGRE, 34-04, 1972.
“Under-Frequency Load Shedding as a Means for Automatic Elimination of Emergencies,” J.D. Barkan, Nokhum S. Markushevich, R.R. Rudzitis, V.N. Golubev, Electricheskie Stancii # 5, 1966, pp. 74‑78.
“Selective System of Automatic Reclosing after Automatic Frequency Load Shedding,” Nokhum S. Markushevich, Electricheskie Stancii, #7 1964, pp. 71‑73.
“Real-time data exchange for on-line security assessment,” K, Kato et. al, Power Industry Computer Application Conference, May 1991, pp 30-36.
Syncro Phasor Domain Template, William Premerlani.
Fast Simulation and Modeling System RFP, E2I/CEIDS, September 2003.
“Adaptive Protection as Preventive and Emergency Control,” M.J.Damborg et. al. Power Engineering Society Summer Meeting, 2000. IEEE, Volume: 2 , 16-20 July 2000, Page(s): 1208 -1212 vol. 2.
Specification of integrated SCADA/EMS/DMS for Florida Power and Light (FP&L and UCI proprietary).
“Inter-area oscillation damping with power system stabilizers and synchronized phasor measurements.” Snyder, A.F.; Hadjsaid, N.; Georges, D.; Mili, L.; Phadke, A.G; Faucon, O.; Vitet, S.; Power System Technology, 1998. Proceedings, POWERCON’98. 1998 International Conference on, Volume: 2, 18-21 Aug. 1998 Pages: 790 – 794 Vol.2.
“A fundamental study of inter-area oscillations in power systems.” Klein, M.; Rogers G.J.; Kundur P., Power Systems, IEEE Transactions on, Volume: 6, Issue: 3, Aug. 1991 Pages: 914 – 921.
“Coordinated Decentralized Optimal Control of Inter-Area Oscillations in Power Systems.” Lie, T.T.; Li, G.J.; Shrestha, G.B.; Lo, K.L.; Energy Management and Power Delivery, 1998, Proceedings of EMPD’98, 1998.
“Using global control and SMES Device to damp inter-area oscillations: an exploratory assessment.” Heniche, A.; Kamwa, I.; Power Engineering Society Summer Meeting, 2000, IEEE, Volume: 3, 16-20 July 2000, Pages: 1872-1876 vol. 3.
IEEE C37.118 Standard for Synchrophasors
for Power Systems Draft 3.20,
Dettloff, D. D. Sabin, "Power Quality Performance Component of the Special Manufacturing Contracts Between Power Provider and Customer." Proceedings of the 9th International Conference on Harmonics and Quality of Power (ICHQP), Orlando, Florida, October 2000.
Dettloff, D. D. Sabin, and F. Goodman, "Power Quality Performance as a Component for Special Manufacturing Contracts between Power Provider and Customer." Official Proceedings of the 12th International Power Quality '99 Conference. PowerSystems World '99 Conference and Exhibit, November 1999, Chicago, Illinois.
Gunther, E.W. CC02 Working Group – “Recommendations for Tabulating RMS Variations with Specific Reference to Utility Power Contracts,” Cigre Electra 2001.
Gunther, E. W. “Utilizing Radio Links to Implement Power Quality Monitoring Systems,” PQA 2003 Conference, Monterey, California.
Gunther, E.W. “Signature System Communications – An Open Architecture,” IEEE 2001 T&D Show, New Orleans.
Gunther, E.W. “Advanced Data Processing and Communications Techniques for a Substation Power Quality Information System,” DistribuTECH 2000 Conference.
Gunther, E.W., "UCA and Internet Communications Technology at the Point of Power Quality and Quantity Measurement,” PQA 1999 Conference.
Gunther, E.W. “Using the Internet to Manage Power Quality, Quantity and Price,” DistribuTECH 1999 Conference.
Lamoree, J.D., Santoso, S. et al “Automatic Identification of Power Quality Variations in the Power Quality Diagnostic System,” Proceedings: 1997 PQA 97 Conference, Columbus, Ohio.
Leinfuss, E. and Lamoree, J.D. “Using the Internet for Dispatch of Aggregated Backup Generation To Address Power System Constraints,” Proceedings: 2003 DistribuTECH Conference, Las Vegas, Nevada.
Smith, J.W. and Zavadil, R.M. “Electric Utility Study Requirements and Needs for Interconnecting Large Windplants to the Transmission Network” Windpower 2000, Palm Springs, California.
Smith, S., Brown, M.A., and Voss, M.K. Exchanging Energy Technology Information on the Internet. U.S. Department of Energy/Oak Ridge National Laboratory, 1996.
Smith, S., Mueller, D.R., and Thompson, J.L. “Usage of Web Technologies for Delivery of Value-Added and Premium Services to Residential and Commercial Customers in a Deregulated Environment,” paper presented at 9th National Energy Services Conference; December 7-9, 1998; Orlando, Florida.
McGranaghan, M. and Smith, S. “Power Quality Monitoring: A Changing Market,” Power Quality, January/February 2002, pp.22-25.
Hirst, E. and Kirby, B. “Metering, Communications, and Computing for Price-responsive Demand Programs,” Electric Light & Power, August 2001.
Fardanesh, B. “Future Trends in Power System Control,” IEEE Computer Applications in Power, July 2002.
Other Documents Reviewed
EPRI, CIWG, 1997. “Working Draft,. UCA Version 2.0. Forum Customer Interface Working Group (CIWG)”. August 1997, EPRI, Palo Alto, CA. EPRI, GOMSFE, 1999. “Working Draft,
UCA Version 2.0. Generic Object Models for Substation & Feeder Equipment (GOMSFE). Version 0.9f. 1999.UCA reference.
Kintner-Meyer, M; Burns, M., Utility/Energy Management and Controls System (EMCS) Communication Protocol Requirements. Final Report of ASHRAE Research Project 1011-RP, 1999.
Web Services Security and More: The Global XML Web Services Architecture (GXA) By Joseph M. Chiusano, Booz Allen Hamilton - http://www.developer.com/design/article.php/2171031
OASIS Standards and Protocol, version 1 through version 1.4.
Transaction Management System (TMS), Architectural Design, EPRI 1998.
Specifications for DSTAR Market Operations and EMS (Proprietary), 2001.
IEEE Standard for Distributed Resources Interconnected With Electric Power Systems. IEEE SCC21 Par 1547.
Omaha Public Power District (OPPD) Automatic Meter Reading (AMR) Feasibility Study, July 2001.
Cost Benefit
Analysis of AMR Systems for the Puerto Rico Electric Power Authority (PREPA),
Omaha Public Power District (OPPD) Automation Plan, April 2000.
IEC/TR 62357 (2003-07) Power system control and associated communications - Reference architecture for object models, services and protocols, IEC 2003.
ISO/IEC 7498-1:1994, Information technology -- Open Systems Interconnection – Basic Reference Model: The Basic Model, ISO 1994.
IEC 61850-7-1, Communication networks and systems in substations – Part 7-1.
IEC 61850-7-2, Communication networks and systems in substations – Part 7-2.
IEC 61850-7-3, Communication networks and systems in substations – Part 7-3.
IEC 61850-7-4, Communication networks and systems in substations – Part 7-4.
Introduction to UCA® Version 2.0, IEEE TR 1550, November 1999.
IEEE-SA Technical Report on the Utility Communications Architecture (UCATM) Version 2.0. IEEE-SA TR 1550-1999.
Common Application Service Model (CASM), IEEE TR 1550, November 1999.
Generic Object Model for Substation and Field Equipment (GOMSFE), IEEE TR 1550, November 1999.
InterControl Center Communications Protocol (ICCP).
IEC 870-6-503: TASE.2 Services and Protocol, (2002-04).
IEC 870-6-802: TASE.2 Object Models, (2002-04).
IEC 870-6-702: TASE.2 Application Profile, (1998-10).
Integrated UCA For Gas Industry, EPRI WO-8606-02, November 1999.
IEC/TR 62210 (2003-05) Power system control and associated communications - Data and communication security, IEC 2003.
UCA™ Data Acquisition and Control (DAC) Client Application Guidelines, EPRI WO-8606-02, December 1999.
Network and System Management (NSM) Development for Distribution Automation (DA), EPRI 1001701, December 2002.
Communications Technology Assessment, EPRI CD-ROM, December 2002.
Utility Telecommunication System Costs, EPRI 2001.
Security Enhancements for Utility Information Architectures, August, 2002, EPRI EP-P10074
Scoping Study on Security Processes and Impacts, July 2003, EPRI 057144
Integrated UCATM for Gas Industry: Volume 1: Gas Industry Requirements, EPRI, Palo Alto, CA and Gas Research Institute, Des Plaines, IL: 2001. EPRI 1001399; GRI-01/0073.1.
Integrated UCATM for Gas Industry: Volume 3: Guidelines for UCA Data Acquisition & Control (DAC) System, EPRI, Palo Alto, CA and Gas Research Institute, Des Plaines, IL: 2001. EPRI 1001401; GRI-01/0073.3.
ICCP (TASE.2) Security Requirements: Executive Summary, EPRI, Palo Alto, CA: 2002. 1001641.
Communications Technology Assessment (CTA) for the Automation of Utility Operations, EPRI, Palo Alto, CA: 2002. 1001695.
Network and System Management for Distribution Automation, EPRI, Palo Alto, CA: 2002. 1001701.
Data Standardization and Integration Using Web-based Tools, EPRI, Palo Alto, CA: 2002. 1001786.
EPRI CIM Status and Guidelines for T&D Applications, EPRI, Palo Alto, CA: 2002. 1001801.
Security Enhancements for Utility Information Architectures, EPRI, Palo Alto, CA: 2002. 1002651.
Case Studies on Internet Data Centers, EPRI, Palo Alto, CA: 2001. 1005941.
Performance Implications for Wireless Systems and Networks, EPRI, Palo Alto, CA: 2001. 1005944.
Modeling and Diagnosis Methods for Large-Scale Complex Networks: EPRI/DoD Complex Interactive Networks/Systems Initiative: Second Annual Report, EPRI, Palo Alto, CA: 2001.1006092.
Communication on Power Lines: Changing Business & Technology Ramifications, EPRI, Palo Alto, CA: 2002. 100697.
Distribution Automation Pilot Project Using the Utility Communications Architecture (UCA®) at City Public Service of San Antonio, EPRI, Palo Alto, CA: 2002. 1007066.
Developing Customer Service Opportunities: A Case Study Employing Advanced Metering, Communication, and Information Technologies, EPRI, Palo Alto, CA: 1995. TR-105381.
Wireless Product Applications for Utilities: Technical Services for Power Utilities in Wireless Communications, EPRI, Palo Alto, CA: 1996. TR-106352.
Broadcast and Multicast for Customer Communications and Distribution Automation, EPRI, Palo Alto, CA: 1996. TR-106354.
Assessments of Emerging Technologies for Wireless Communications, EPRICSG, Palo Alto, CA: 1998. TR-110125.
Re Quest IVTM: A Continuing Investigation of the Residential Telecommunications and Electric Marketplaces, EPRI, Palo Alto, CA: 1998. TR-110816-OL.
Utility-Customer Communication Options for the “Last Mile,” EPRICSG, Palo Alto, CA: 1998. TR-111023.
Application Opportunities in Wireless Communications, EPRICSG, Palo Alto, CA: 1998. TR-111051.
Worldwide Satellite Communications for the Energy Utility Industry, EPRICSG, Palo Alto, CA: 1998. TR-111052.
Integration of Distributed Resources in Electric Utility Systems: Functional Definition for Communication and Control Requirements, EPRI, Palo Alto, CA: 1998. TR-111491.
Assessing Changes in the Residential Telecommunications and Electric Marketplace: Evaluating Purchases, EPRICSG, Palo Alto, CA: 1998. TR-112125-P1-3ES.
Straw-man Device Object Models for Distributed Resources in Utility Communication Architecture (UCATM), EPRI, Palo Alto, CA: 1999. TR-114198.
Supplier and Control Area Performance Monitoring System: Utilization of Grid-3P for Automatic Generation Control (AGC), Frequency Response Reserves (FRR) and Ancillary Services (AS) Regulation, Carlos Martinez, Jim Dyer, Mark Skowronski, Electric Power Group. February 2003.
Real-Time Voltage Monitoring and VAR Management System©, Carlos Martinez, Jim Dyer, Mark Skowronski, Electric Power Group. February 2003
CERTS Area Control Error (ACE)-Frequency Real-Time Monitoring System, Electric Power Group. October 2002.
“Human Factors Aspects Of Power System Voltage Visualizations,” Wiegmann, D.A., A.M. Rich, T.J. Overbye, Y. Sun. Proceedings of the 35th Hawaii International Conference on System Sciences. September 2002.
CAISO-CERTS Synchronized Phasor Measurements Applications User Guide, Consortium for Electricity Reliability Technology Solutions (CERTS). March 2002.
“Human Factors Analysis Of Power System Visualizations,” Overbye, T.J., D.A. Wiegmann, A.M. Rich, Y. Sun. Proceedings of the 34th Hawaii International Conference on System Sciences. September 2001.
“Grid Reliability Management Tools,” Eto
J., Lawrence Berkeley National Laboratory, C. Martinez, Southern California
Edison and J. Dyer and V. Budhraja, Electric Power
Group. IEEE Power Engineering Society Winter Meeting.
Reliability Adequacy Tool for Ancillary Services, Consortium for Electric Reliability Technology Solutions. April 2000.
“Probabilistic Load-Dependent Cascading Failure with Limited Component Interactions,” Dobson, I., University of Wisconsin, B. Carreras, Oak Ridge National Lab, and D. Newman, University of Alaska IEEE International Symposium on Circuits and Systems, Vancouver Canada May 2004.
“Blackout Mitigation Assessment in Power Transmission Systems,” Carreras, B.A., V.E. Lynch, D.E. Newman, I. Dobson. Hawaii International Conference in Systems Sciences. January 2003.
“A Probabilistic Loading-dependent Model of Cascading Failure and Possible Implications for Blackouts,” Dobson, I., B.A. Carreras, D.E. Newman. Hawaii International Conference in Systems Sciences. January 2003.
“An Initial Complex Systems Analysis of the Risks of Blackouts in Power Transmission Systems,” Dobson, I., D.E. Newman, B.A. Carreras, V.E. Lynch. Power Systems and Communications Infrastructures for the Future. September 2002.
Congestion Management Requirements, Methods and Performance Indices, Kirby, B.J., J.W. Van Dyke, C. Martinez and A. Rodriguez. Report: ORNL/TM-2002/119. June 2002.
“Dynamics, Criticality and Self-organization in a Model for Blackouts in Power Transmission Systems,” Carreras, B.A., I. Dobson, V.E. Lynch, D.E. Newman. Hawaii International Conference in Systems Sciences. January 2002.
“Examining Criticality of Blackouts in Power System Models with Cascading Events,” Dobson, I., J. Chen, J.S. Thorp, B.A. Carreras, D.E. Newman. Hawaii International Conference in Systems Sciences. January 2002.
Complex Systems Approach to Cascading Failures, Carreras, B. A., I. Dobson and J. S. Thorp. December 2001.
Time-space Methods for Determining Locational Reserves: A Framework for Location Based Pricing and Scheduling for Reserve Markets, Thorp, J., C. E. Murillo-Sanchez and B. Thomas. November 2001.
Software Requirements Specification for Management for Grid Control, Smathers, D., L. Kidd, S. Goldsmith, L. Phillips, D. Bakken, A. Bose, D. McKinnon. April 2003.
Communication Models for Third Party Load Frequency Control, Bhowmik, S., K. Tomsovic, A. Bose. 2003.
“A New Scheme for Voltage Control in a Competitive Ancillary Service Market,” Nobile, E., and A. Bose. 14th PSCC, Sevilla, 24-28 June 2002.
Increasing Information Flow Between PDCs, Dart, E., Sandia National Laboratory. December 2000.
“Dynamic Performance Validation in the Western Power System,” Hauer, J. F., M. J. Beshir, and W. A. Mittelstadt, in association with the WSCC Performance Validation Task Force APEX 2000 Conference in Kananaskis, Alberta. October 2000.
Agent Concept for Intelligent Distributed Coordination in
the Electric Power Grid, Smathers D.
and S. Goldsmith, Sandia National Laboratories.
Operating Environment and Functional Requirements for
Intelligent Distributed Control in the Electric Power Grid, Smathers
D. and A. Akhil, Sandia
National Laboratories.
The New York Transmission Congestion Contract Market: Is It Truly Working Efficiently?, Bartholomew, E., A. Siddiqui, C. Marnay and S. Oren. June 2003.
On the Efficiency of the New York Independent System Operator Market for Transmission Congestion Contracts, Siddiqui, A., E. Bartholomew, C. Marnay, and S. Oren. March 2003.
“Locational Pricing and Scheduling for an Integrated Energy-Reserve Market,” Chen, J., J.S. Thorp, R.J. Thomas, T.D. Mount. Conference Proceedings: 36th Annual Hawaii International Conference on System Sciences (HICSS). January 2003.
“Markets for Reliability and Financial Options in Electricity: Theory to Support Practice”, Mount, T., W. Schulze, R.E. Schuler. Conference Proceedings: 36th Annual Hawaii International Conference on System Sciences (HICSS). January 2003.
Time-space Methods for Determining Locational Reserves: A Framework for Location-based Pricing and Scheduling for Reserve Markets, Thorp, J.S. R.J. Thomas, J. Chen. December 2002.
Two-Settlement Systems for Electricity Markets: Zonal Aggregation Under Network Uncertainty and Market Power, Kamat, R. and S. Oren, UC Berkeley. February, 2002.
Methodology for Automatic Zone Creation/Merging/Partitioning, Alvarado, F.L. and W. Liu. May 2001.
Rational Buyer Meets Rational Seller: Reserves Market Equilibria under Alternative Auction Designs, Kamat, R. and S. Oren, UC Berkeley.
Design of Ancillary Service Markets, Oren S., UC Berkeley. January 2001.
Spot Pricing of Electricity and Ancillary Services in a Competitive California Market, Siddiqui, A., C. Marnay, and M. Khavkin. November 2000.
CERTS Database Brochure, Marnay, C., A. Siddiqui, J. Guttenplan, and M. Khavkin. August 2000.
Analysis of Uniform and Discriminatory Price Auctions in Restructured Electricity Markets, Hudson R., Oak Ridge National Laboratory. July 2000.
“Excessive Price Volatility in the California Ancillary Services Markets: Causes, Effects, and Solutions,” Siddiqui, A., C. Marnay, and M. Khavkin. Electricity Journal, Vol. 13(6). July 2000.
Experimental and Theoretical Evaluation of Current and Proposed Markets Including Effects of Ancillary Services, Thomas R., T. Mount, R. Zimmerman and S. Ede, Power Systems Engineering Research Center, Cornell University. March 2000.
Customer-Specific Metrics For the Regulation and Load-Following Ancillary Services, Kirby, B. and E. Hirst. January 2000.
Transmission Grid Access and Pricing in Norway, Spain, and California: A Comparative Study, Grønli, H., T. Gómez, and C. Marnay. September 1999.
Ancillary Services Markets in California, Gómez, T., C. Marnay, A. Siddiqui, L. Liew, and M. Khavkin. July 1999,
Microgrid: A Conceptual Solution, Lasseter, R.H., P. Piagi, University of Wisconsin-Madison. June 2004.
A Business Case for On-Site Generation: The BD Biosciences Pharmingen Project, Firestone, R., C. Creighton, O. Bailey, C. Marnay and M. Stadler. February 2003.
Microgrid Energy Management System, Kueck, J.D., R.H. Staunton, S.D. Labinov, B.J. Kirby. January 2003.
Review of Test Facilities for Distributed Energy Resources, Akhil, A., Sandia National Laboratories, C. Marnay, Lawrence Berkeley National Laboratory, T. Lipman, University of California, Berkeley. Report Numbers: SAND2003-1602, LBNL-51954. October 2002.
Integration of Distributed Energy Resources: The CERTS Microgrid Concept, Lasseter, R., A. Akhil, C. Marnay, J. Stephens, J. Dagle, R. Guttromson, A.S. Meliopoulous, R. Yinger, and J. Eto. April 2002.
White Paper on Protection Issues of The MicroGrid Concept, Feero, W.E., D.C. Dawson and J. Stevens. March 2002.
Industrial Application of Microgrids, Lasseter R. and P. Piagi. October 2001.
Evaluation of Distribution Analysis Software for DER Applications, Rizy, D.T. and R.H. Staunton. Report: ORNL/TM-2001/215. September 2002.
Behavior of Capstone and Honeywell Microturbine Generators during Load Changes, Yinger, R. J. July 2001.
Scenarios for Distributed Technology Applications with Steady State and Dynamic Models of Loads and Micro-Sources, Lasseter R., K. Tomsovic and P. Piagi. April 2000.
Distributed Energy Resources Customer Adoption Modeling with Combined Heat and Power Applications, Siddiqui, A., R. Firestone, S. Ghosh, M. Stadler, C. Marnay, and J. Edwards. June 2003.
Distributed Energy Resources in Practice: A Case Study Analysis and Validation of LBNL's Customer Adoption Model, Bailey, O., C. Creighton, R. Firestone, C. Marnay and M. Stadler. February 2003.
Modeling of Customer Adoption of Distributed Energy Resources, Marnay, C., J. S. Chard, K. S. Hamachi, T. Lipman, M. M. Moezzi, B. Ouaglal, and A. S. Siddiqui. August 2001.
Customer Adoption of Small-Scale On-Site Power Generation, Siddiqui, A., C. Marnay, K. Hamachi and F. Rubio. April 2001.
CERTS Customer Adoption Model, Rubio, F., A. Siddiqui, C. Marnay and K. Hamachi. March 2001.
Integrated Assessment of Dispersed Energy Resources Deployment, Marnay, C., R. Blanco, K. Hamachi, C. Kawann, J. Osborn, and F. Rubio. March 2000.
“Research, Development, and Demonstration Needs for
Large-Scale, Reliability-Enhancing, Integration of Distributed Energy
Resources,” Eto, J., Lawrence Berkeley National
Laboratory and V. Budhraja, C. Martinez, J. Dyer and
M. Kondragunta, Edison Technology Solutions.
Proceedings of the Thirty-Third Annual Hawaii International Conference on
System Sciences,
Demand Response Research Plan to Reflect the Needs of the California Independent System Operator, Kueck, J. and B. Kirby, Oak Ridge National Laboratory. January 2004.
Spinning Reserve from Pump Load: A Technical Findings Report to the California Department of Water Resources, Kirby, B. and J. Kueck, Oak Ridge National Laboratory. November 2003.
Spinning Reserve From Responsive Loads, Kirby, B., Oak Ridge National Laboratory. March 2003.
How and Why Customers Respond to Electricity Price Variability: A Study of NYISO and NYSERDA 2002 PRL Program Performance, Neenan, B., D. Pratt, P. Cappers, J. Doane, J. Anderson and R. Boisvert (Neenan Associates), Goldman, C., O. Sezgen, G. Barbose and R. Bharvirkar (LBNL), Michael Kinter-Meyer, Steve Shankle and Derrick Bates (PNNL). January 2003.
Spinning Reserves from Controllable Packaged Through the Wall Air Conditioner (PTAC) Units, Kirby, B.J. and M.R. Ally. November 2002.
“Do ‘Enabling Technologies’ Affect Customer Performance in Price-Responsive Load Programs?” Goldman, C., M. Kintner-Meyer, G. Heffner. 2002 ACEEE's Summer Study on Energy Efficiency in Buildings, Asilomar, CA. August 2002.
Impact of Enabling Technologies on Customer Load Curtailment
Performance: Summer 2001 Results from NYSERDA's PON
585 and 577 Programs and NYISO's Emergency Demand
Response Program, Goldman, C. and G. Heffner (LBNL) and M. Kintner-Meyer
(PNNL).
“Innovative Developments in Load as a Resource,” Eto, J., C. Goldman, G. Heffner, B. Kirby, J. Kueck, M. Kintner-Meyer, J. Dagle, T. Mount, W. Schultze, R.
Thomas, R. Zimmerman. IEEE Power Engineering Society Winter Meeting.
Review of Current Southern California Edison Load Management Programs and Proposal for a New Market-Driven, Mass-Market, Demand-Response Program, Weller, G., Weller Associates. January 2002.
A Case Study Review of Technical and Technology Issues for Transition of a Utility Load Management Program to Provide System Reliability Resources in Restructured Electricity Markets, Weller, G.H. July 2001.
Direct Participation of Electrical Loads in the California
Independent System Operator Markets During the Summer of 2000, Marnay, C., K. Hamachi, M. Khavkin, and A. Siddiqui.
Load as a Resource in Restructured Electricity Markets, Kueck, J., B. Kirby, R. Staunton, Oak Ridge National
Laboratory, J. Eto, C. Marnay,
C. Goldman, Lawrence Berkeley National Laboratory, C. A. Martinez, Southern
California Edison.
“An R&D Agenda to Enhance Electricity System Reliability
by Increasing Customer Participation in Emerging Competitive Markets,” Eto, J., C. Marnay, and C.
Goldman, Lawrence Berkeley National Laboratory, J. Kueck
and B. Kirby, Oak Ridge National Laboratory, J. Dagle,
Pacific Northwest National Laboratory, F. Alvarado, T. Mount, and S. Oren,
PSERC, and C. Martinez, Southern California Edison. IEEE Power Engineering
Society Winter Meeting,
Pilot Evaluation of Electricity-Reliability and Power-Quality Monitoring in California's Silicon Valley with the I-Grid® System, Eto, J., LBNL; D. Divan and W. Brumsickle, SoftSwitching Technologies. February 2004.
A Framework and Review of Customer Outage Costs: Integration and Analysis of Electric Utility Outage Cost Surveys, Lawton, L., M. Sullivan, K. Van Liere, A. Katz, PRS and J. Eto, LBNL. November 2003.
A New Approach to Power Quality and Electricity Reliability Monitoring - Case Study Illustrations of the Capabilities of the I-Grid™ System, Divan, D. and W. Brumsickle, SoftSwitching Technologies Corp. and J. Eto, LBNL. April 2003.
A Scoping Study on Trends in the Economic Value of Electricity Reliability to the U.S. Economy, Eto, J., J. Koomey, B. Lehman, N. Martin, E. Mills, C. Webber, and E. Worrell. June 2001.
Economic Evaluation of Transmission Interconnection in a Restructured Market, Mobasheri, F., M. Cheng, J. Medina. June 2004.
California's Electricity Generation and Transmission Interconnection Needs Under Alternative Scenarios: Assessment of Resources, Demand, Need For Transmission Interconnections, Policy Issues and Recommendations For Long Term Transmission Planning, Budhraja, V., F. Mobasheri, M. Cheng, J. Dyer, E. Castaño, S. Hess. November 2003.
Planning for California's Future Transmission Grid: Review of Transmission System, Strategic Benefits, Planning Issues and Policy Recommendations, Budhraja, V., J. Dyer, S. Hess. October 2003.
Electricity Transmission Congestion Costs: A Review of Recent Reports, Lesieutre, B., and J. Eto. October 2003.
A Survey of National Transmission Grid Modeling Capabilities at DOE Laboratories, Thomas, S., P. Boggs and V. Howle, Sandia National Laboratories. July 2003.
Analysis and Selection of Analytical Tools to Assess National-Interest Transmission Bottlenecks Final Report, KEMA Consulting: KEMA-ECC & Macro Corporation. March 2003.
U.S. Department of Energy Transmission Bottleneck Project Report, Jim Dyer, Electric Power Group. March 2003.
National Transmission Grid Study, May 2002.
Transmission System Operation and Interconnection, Alvarado, F., University of Wisconsin, Madison, and S. Oren, University of California at Berkeley. May 2002.
Reliability Management and Oversight, Kirby, B., Oak Ridge National Laboratory and E. Hirst Consulting in Electric-Industry Restructuring. May 2002.
Alternative Business Models for Transmission Investment and Operation, Oren, S., University of California at Berkeley; G. Gross, University of Illinois at Urbana-Champaign; and F. Alvarado, University of Wisconsin. May 2002.
Transmission Planning and the Need for New Capacity, Hirst, E., Consulting in Electric-Industry Restructuring and B. Kirby, Oak Ridge National Laboratory. May 2002.
Transmission Siting and Permitting, Meyer, D.H., Consultant, Electricity Policy and Regulation and R. Sedano, Regulatory Assistance Project. May 2002.
Advanced Transmission Technologies, Hauer, J., Pacific Northwest National Laboratory; T. Overbye, University of Illinois at Urbana-Champaign; J. Dagle and S. Widergren, Pacific Northwest National Laboratory. May 2002.
California's Electricity System of the Future Scenario Analysis in Support of Public-Interest Transmission System R&D Planning, Joseph Eto, Lawrence Berkeley National Laboratory, John P. Stovall, Oak Ridge National Laboratory, Vikram Budhraja and Jim Dyer, Electric Power Group, Chuck Goldman and Chris Marnay, Lawrence Berkeley National Laboratory, George Gross, Power Systems Engineering Research Center, University of Illinois, Shmuel Oren, Power Systems Engineering Research Center, University of California. April 2003.
Executive Summary for the Grid of the Future Project, Eto, J., Lawrence Berkeley National Laboratory. December 1999.
The Federal Role in Electric System Reliability RD&D During a Time of Industry Transition: An Application of Scenario Analysis. Eto, J., Lawrence Berkeley National Laboratory. December 1999.
Review of Recent Reliability Issues and System Events, Hauer, J. and J. Dagle, Pacific Northwest National Laboratory. December 1999.
Review of the Structure of Bulk Power Markets, Kirby, B. and J. Kueck, Oak Ridge National Laboratory. December 1999.
Real Time Security Monitoring and Control of Power Systems, Gross, G., A. Bose, C. Demarco, M. Pai, J. Thorp, and P. Varaiya, Power Systems Engineering Research Center. December 1999.
Interconnection and Controls for Large Scale Integration of Distributed Energy Resources, Budhraja, V., C. Martinez, J. Dyer, and M. Kondragunta, Edison Technology Solutions. December 1999.
Accommodating Uncertainty in Planning and Operations, Ivey, M., A. Akhil, D. Robinson, J. Stamp, K. Stamber, Sandia National Laboratories, and K. Chu, Pacific Northwest National Laboratory. December 1999.
Summary Proceedings of IEEE-USA's 2000 Energy Policy Symposium, May 24, 2000.
This page intentionally left blank.